Cleveland CUY-Port Authority
ID: 9c22b
• State: Ohio
Opportunity Assistant
Loading
Description
Background
The Cleveland-Cuyahoga County Port Authority is implementing a multi-phase port electrification program supported by the United States Environmental Protection Agency (USEPA) Clean Ports program. The goal of this initiative is to deploy zero-emission (ZE) equipment and renewable energy to improve air quality for Cleveland communities, reduce greenhouse gas (GHG) emissions, and establish a foundation for rapid decarbonization in the coming years.
Work Details
The contract involves the integration, design support, and procurement for a Battery Energy Storage System (BESS) and microgrid systems. The specific requirements include:
(1) Supporting Jacobs in completing the 100% design package;
(2) Furnishing the BESS equipment and related equipment, excluding solar equipment which has already been purchased by the Port;
(3) Integrating the DC coupled solar photovoltaic (PV) plus BESS architecture into a unified system;
(4) Executing all tasks necessary to pursue utility interconnection with Cleveland Public Power (CPP);
(5) Performing all tasks related to the operation and maintenance (O&M) of the provided BESS system.
The installation will consist of approximately 2.15 MW-dc solar PV plus a 2 MW / 8 MWh DC-coupled BESS, primarily used in a grid-connected model to offset projected utility electric load for cost savings.
Period of Performance
The contract performance period is not explicitly stated in the provided information.
Place of Performance
The geographic location for performance is Cleveland, Ohio.
Bidder Requirements
No specific set-aside certifications or requirements are mentioned.
The Cleveland-Cuyahoga County Port Authority is implementing a multi-phase port electrification program supported by the United States Environmental Protection Agency (USEPA) Clean Ports program. The goal of this initiative is to deploy zero-emission (ZE) equipment and renewable energy to improve air quality for Cleveland communities, reduce greenhouse gas (GHG) emissions, and establish a foundation for rapid decarbonization in the coming years.
Work Details
The contract involves the integration, design support, and procurement for a Battery Energy Storage System (BESS) and microgrid systems. The specific requirements include:
(1) Supporting Jacobs in completing the 100% design package;
(2) Furnishing the BESS equipment and related equipment, excluding solar equipment which has already been purchased by the Port;
(3) Integrating the DC coupled solar photovoltaic (PV) plus BESS architecture into a unified system;
(4) Executing all tasks necessary to pursue utility interconnection with Cleveland Public Power (CPP);
(5) Performing all tasks related to the operation and maintenance (O&M) of the provided BESS system.
The installation will consist of approximately 2.15 MW-dc solar PV plus a 2 MW / 8 MWh DC-coupled BESS, primarily used in a grid-connected model to offset projected utility electric load for cost savings.
Period of Performance
The contract performance period is not explicitly stated in the provided information.
Place of Performance
The geographic location for performance is Cleveland, Ohio.
Bidder Requirements
No specific set-aside certifications or requirements are mentioned.
Loading Map
Loading Map
Overview
Opportunity ID
9c22b
Response Deadline
May 28, 2026
Past Due
Date Posted
April 28, 2026
Source
Est. Value Range
Experimental
$5,000,000 - $15,000,000
(AI estimate)
On 4/28/26 Ohio Department of Transportation - Local Lettings in Ohio issued Cleveland Port Authority Project with ID 9c22b due 5/27/26.
Contacts
Documents
Posted documents for Cleveland CUY-Port Authority
Opportunity Assistant
AI Analysis
AI Generate