Search Contract Opportunities

Cypress Bayou Green Infrastructure Project

ID: 123457-SB1849 • State: Louisiana
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Summarize the work to be completed under this opportunity
Does this solicitation list any subcontracting requirements?
List any requirements necessary to complete this contract
I'd like to anonymously submit a question to the procurement officer(s)
Loading
Get Real Time Alerts from 40k+ Federal, State and Local Agencies
Find Now

Description

Cypress Bayou Green Infrastructure Project
Background
The Recreation and Park Commission for the Parish of East Baton Rouge is issuing a solicitation for the Cypress Bayou Green Infrastructure Project. This project aims to enhance stormwater management and recreational facilities in the area, contributing to the overall mission of improving community parks and environmental quality.

Work Details
The work includes several key components:

1. **Sediment Forebay**: Construction upstream of Greenwood Lake to improve stormwater quality and reduce sedimentation.

2. **Lake Expansion and Improvements**: Expanding the lake for additional drainage storage and recreational benefits, designed with an aesthetic amphitheater landform.

3. **Existing Lake Improvements**: Excavation to achieve a minimum pond depth of 5 feet, modifications to the existing weir, and adjustments to decks and banks around the lake perimeter.

4. **Lakeview Shelter**: A shelter structure overlooking Greenwood Lake for community use, included in the master plan.

5. **Cypress Bayou Channel Improvements**: Enhancements from Lavey Lane to the existing lake for better drainage and recreational paddling opportunities, including slope adjustments to prevent erosion and deepening for kayaking.

6. **Trail Connection to Lavey Lane**: Clearing wooded areas along Cypress Bayou for excavator access, followed by replanting and constructing a walkable trail connecting to Lavey Lane, with plantings added for area improvement.

7. **Amphitheater Landform**: Creation of an amphitheater using material from lake excavation, landscaped for future use.

8. **Path Along Entrance from Roundabout to Hwy 19**: A path providing pedestrian connectivity from the park core to a sidewalk project along Hwy 19.

Period of Performance
The contract work is expected to be performed following the bid opening on April 29, 2025, with specific timelines outlined in subsequent project planning.

Place of Performance
The project will be performed at various locations within East Baton Rouge Parish, specifically around Greenwood Lake and Cypress Bayou.

Overview

Agency
Opportunity ID
123457-SB1849
Response Deadline
April 29, 2025 Past Due
Date Posted
April 2, 2025
Est. Value Range
Experimental
$5,000,000 - $10,000,000 (AI estimate)
Agency Distribution
High
Source
Source Notes
Source does not have an individual page for this opportunity. To find the opportunity, go to the Source website listed above, search for open opportunities, and search the results page for the Opportunity ID. Note that historical opportunities may no longer be available at the source.
On 4/2/25 Non State - BREC in Louisiana issued Cypress Bayou Green Infrastructure Project with ID 123457-SB1849 due 4/29/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Cypress Bayou Green Infrastructure Project

Additional Details

Section
Finance

Similar Active Opportunities