Search Documents
No Results Found.
No Results Found.
SWF JA Phase One Screwworm Redacted.pdf
Posted: March 6, 2026
• Type: .pdf
• Size: 2.75MB
Submit Questions to Government Officer Anonymously
Place your question(s) below. One of our analysts will anonymously submit the question(s) within 8 hours and provide any responses via email once received.
Opportunity Assistant
Hello! Please let me know your questions about this document.
Loading
Save a Question
Customize Generation
We will write a draft based on the below linked information. Add or link more information to improve the draft.
Federal Profile
Select the Federal company profile to use when informing the response based on publicly available data.
Loading federal profile search...
Company Context
Add capability statements, prior responses, or other company materials to customize the response to your business.
Checking for company documents...
Opportunity Context
Add SOWs, attachments, or other files specific to this opportunity.
Checking for opportunity documents...
Link a Pursuit
Optionally associate this draft with an existing pursuit.
Overview
Related Opportunity
Related Agency
Summary
This Justification and Approval (J&A) for Other than Full and Open Competition specifically addresses the urgent need for the design and construction of a New World Screwworm (NWS) Sterile Fly Production Facility.
The J&A is issued under the authority of 10 U.S. Code 3204(a)(2) and FAR Part 6.302-2, citing "Unusual and Compelling Urgency" as the rationale for limiting the solicitation to five qualified contractors. The facility, located at Moore Airfield in Hidalgo County, Texas, is critical for the USDA's efforts to prevent a potential NWS outbreak that poses significant threats to livestock and wildlife in the United States.
The contract will be a firm-fixed-price design-build standalone agreement aimed at producing up to 300 million sterile flies per week, which is essential for the USDA's Sterile Insect Technique (SIT) program. This program is designed to eradicate NWS infestations that have historically caused severe economic losses in agriculture.
The urgency of this project stems from recent outbreaks in Mexico and Central America, which have prompted immediate action to establish production capabilities that meet stringent biosecurity requirements. The anticipated timeline for constructing the initial capacity of 100 million flies per week is 12-18 months, with further expansions potentially taking up to 48 months.
The document outlines several alternatives considered before opting for this limited competition approach, including full and open competition, extension of existing contracts, and utilizing in-house resources. However, these alternatives were deemed inadequate due to potential delays that could exacerbate the risk of an NWS outbreak, leading to catastrophic economic impacts estimated at $1.8 billion for Texas alone.
The J&A emphasizes that swift action is necessary not only to protect public health but also to safeguard national food security and agricultural stability against a backdrop of increasing threats from NWS infestations.
The J&A is issued under the authority of 10 U.S. Code 3204(a)(2) and FAR Part 6.302-2, citing "Unusual and Compelling Urgency" as the rationale for limiting the solicitation to five qualified contractors. The facility, located at Moore Airfield in Hidalgo County, Texas, is critical for the USDA's efforts to prevent a potential NWS outbreak that poses significant threats to livestock and wildlife in the United States.
The contract will be a firm-fixed-price design-build standalone agreement aimed at producing up to 300 million sterile flies per week, which is essential for the USDA's Sterile Insect Technique (SIT) program. This program is designed to eradicate NWS infestations that have historically caused severe economic losses in agriculture.
The urgency of this project stems from recent outbreaks in Mexico and Central America, which have prompted immediate action to establish production capabilities that meet stringent biosecurity requirements. The anticipated timeline for constructing the initial capacity of 100 million flies per week is 12-18 months, with further expansions potentially taking up to 48 months.
The document outlines several alternatives considered before opting for this limited competition approach, including full and open competition, extension of existing contracts, and utilizing in-house resources. However, these alternatives were deemed inadequate due to potential delays that could exacerbate the risk of an NWS outbreak, leading to catastrophic economic impacts estimated at $1.8 billion for Texas alone.
The J&A emphasizes that swift action is necessary not only to protect public health but also to safeguard national food security and agricultural stability against a backdrop of increasing threats from NWS infestations.