Solicitation Amendment W912DY26RA1360001 SF 30.pdf
Posted: Aug. 28, 2026
• Type: .pdf
• Size: 4.01MB
Submit Questions to Government Officer Anonymously
Place your question(s) below. One of our analysts will anonymously submit the question(s) within 8 hours and provide any responses via email once received.
Opportunity Assistant
Hello! Please let me know your questions about this document.
Loading
Save a Question
Customize Generation
We will write a draft based on the below linked information. Add or link more information to improve the draft.
Federal Profile
Select the Federal company profile to use when informing the response based on publicly available data.
Loading federal profile search...
Company Context
Add capability statements, prior responses, or other company materials to customize the response to your business.
Checking for company documents...
Opportunity Context
Add SOWs, attachments, or other files specific to this opportunity.
Checking for opportunity documents...
Link a Pursuit
Optionally associate this draft with an existing pursuit.
Overview
Related Opportunity
Related Agency
Summary
Amendment 0001 to the U.S. Army solicitation W912DY26RA136 for the FY26 Luke Air Force Base Dormitory Building 635 Renovation updates the proposal deadline, corrects the applicable building number, revises contract requirements, and adds or incorporates supporting solicitation documents.
The proposal submission deadline is extended from 31 August 2026 at 12:00 p.m. to 8 September 2026 at 2:00 p.m. CDT, with offers to be submitted to the W2V6 USA Engineering Support Center, Huntsville, Contracting Division, Redstone Arsenal, Alabama. CLIN 0001 is corrected to identify Building 635—not Building 3620—as the facility for which the contractor must provide design services for the Luke Dorm Building Repairs, including the value-engineering study and life-cycle cost analysis required under Tasks 1 and 2.
The amendment incorporates the Government’s responses to ProjNet questions; a revised Statement of Work dated 27 August 2026; amended Division 01 specifications; and Appendix 15, “B635 to B465 Fiber Path HH-634.”
It also formally lists the original solicitation attachments, including:
- Existing controls protocols
- Safety requirements prohibiting dual hatting
- Building 635 photographs and CAD drawings
- Minimum qualifications
- The Building 635 fire hydrant flow test
- Environmental report
- Design standards and codes
- FRR-21-001 workplan outline requirements
- An exterior wall section
- The applicable Davis-Bacon wage determination modification
- The submittal register
- PA Map 22
The amendment further revises the Construction Liquidated Damages clause to require payment of $1,870.80 for each calendar day of delay until completion or acceptance, with damages continuing to accrue if the Government terminates the contractor’s right to proceed.
All other solicitation provisions remain unchanged, and offerors must acknowledge receipt of the amendment in accordance with the Standard Form 30 instructions.
The proposal submission deadline is extended from 31 August 2026 at 12:00 p.m. to 8 September 2026 at 2:00 p.m. CDT, with offers to be submitted to the W2V6 USA Engineering Support Center, Huntsville, Contracting Division, Redstone Arsenal, Alabama. CLIN 0001 is corrected to identify Building 635—not Building 3620—as the facility for which the contractor must provide design services for the Luke Dorm Building Repairs, including the value-engineering study and life-cycle cost analysis required under Tasks 1 and 2.
The amendment incorporates the Government’s responses to ProjNet questions; a revised Statement of Work dated 27 August 2026; amended Division 01 specifications; and Appendix 15, “B635 to B465 Fiber Path HH-634.”
It also formally lists the original solicitation attachments, including:
- Existing controls protocols
- Safety requirements prohibiting dual hatting
- Building 635 photographs and CAD drawings
- Minimum qualifications
- The Building 635 fire hydrant flow test
- Environmental report
- Design standards and codes
- FRR-21-001 workplan outline requirements
- An exterior wall section
- The applicable Davis-Bacon wage determination modification
- The submittal register
- PA Map 22
The amendment further revises the Construction Liquidated Damages clause to require payment of $1,870.80 for each calendar day of delay until completion or acceptance, with damages continuing to accrue if the Government terminates the contractor’s right to proceed.
All other solicitation provisions remain unchanged, and offerors must acknowledge receipt of the amendment in accordance with the Standard Form 30 instructions.