Search Documents
No Results Found.
No Results Found.
ATTACHMENT 12 AMMENDED DIV 01Specifications 27AUG26.pdf
Posted: Aug. 28, 2026
• Type: .pdf
• Size: 1.24MB
Submit Questions to Government Officer Anonymously
Place your question(s) below. One of our analysts will anonymously submit the question(s) within 8 hours and provide any responses via email once received.
Opportunity Assistant
Hello! Please let me know your questions about this document.
Loading
Save a Question
Customize Generation
We will write a draft based on the below linked information. Add or link more information to improve the draft.
Federal Profile
Select the Federal company profile to use when informing the response based on publicly available data.
Loading federal profile search...
Company Context
Add capability statements, prior responses, or other company materials to customize the response to your business.
Checking for company documents...
Opportunity Context
Add SOWs, attachments, or other files specific to this opportunity.
Checking for opportunity documents...
Link a Pursuit
Optionally associate this draft with an existing pursuit.
Overview
Related Opportunity
Related Agency
Summary
This **amended Division 01 project specification** establishes the general requirements for the U.S. Air Force FY26 renovation of Dormitory Building 635 at Luke Air Force Base, Arizona, including complete interior and exterior repair, renovation, design-after-award, construction, commissioning, safety, quality-control, environmental, scheduling, submittal, and closeout requirements.
The work requires the contractor to provide all labor, materials, equipment, investigations, design documentation, and construction necessary to meet the project’s Statement of Work and Division 01 specifications. The building will be unoccupied during performance, and existing work that remains must be protected, repaired, or restored to an equal-or-better condition.
The specification’s table of contents includes requirements for:
- Summary of work
- Work restrictions
- Pricing and payment
- Administration
- Project scheduling
- Submittals
- Design data
- Governmental safety
- Reference publications
- Quality control
- Special inspections
- Temporary facilities and controls
- Environmental controls
- Project identification
- Waste management
- Closeout and operations-and-maintenance data
- Facility data
- Building commissioning
Before excavation, the contractor must:
- Obtain required digging permits.
- Notify the applicable authorities at least 48 hours in advance.
- Use local utility locating services and an independent private utility locator.
- Scan the work area using ground-penetrating radar, electromagnetic, or sonic equipment to identify utilities and obstructions.
The contractor must also prepare a site investigation report, hazard and risk analysis, disruption plan, mold/asbestos/lead-based-paint assessment and abatement plan, proposed work plan, design alternatives, and cost proposals when directed under the facility repair and renewal process.
Work may generally occur from 7:00 a.m. to 3:30 p.m., Monday through Saturday, excluding Government holidays. Work outside regular hours requires advance written approval, normally submitted 15 calendar days beforehand, and utility cutovers are to occur outside normal hours unless otherwise directed.
Contractor personnel must comply with installation access and security requirements, including DBIDS registration or limited one-day pass procedures, ongoing background-screening eligibility, badge-return and lost-badge notification requirements, installation smoking restrictions, and applicable radiation-control procedures for radioactive testing equipment.
The project also requires compliance with USACE EM 385-1-1 safety requirements, Government review of designated “G” and “S” submittals, protection of existing facilities and contents, coordination of utility interruptions, construction waste management, commissioning, and submission of final operation, maintenance, and facility data.
The work requires the contractor to provide all labor, materials, equipment, investigations, design documentation, and construction necessary to meet the project’s Statement of Work and Division 01 specifications. The building will be unoccupied during performance, and existing work that remains must be protected, repaired, or restored to an equal-or-better condition.
The specification’s table of contents includes requirements for:
- Summary of work
- Work restrictions
- Pricing and payment
- Administration
- Project scheduling
- Submittals
- Design data
- Governmental safety
- Reference publications
- Quality control
- Special inspections
- Temporary facilities and controls
- Environmental controls
- Project identification
- Waste management
- Closeout and operations-and-maintenance data
- Facility data
- Building commissioning
Before excavation, the contractor must:
- Obtain required digging permits.
- Notify the applicable authorities at least 48 hours in advance.
- Use local utility locating services and an independent private utility locator.
- Scan the work area using ground-penetrating radar, electromagnetic, or sonic equipment to identify utilities and obstructions.
The contractor must also prepare a site investigation report, hazard and risk analysis, disruption plan, mold/asbestos/lead-based-paint assessment and abatement plan, proposed work plan, design alternatives, and cost proposals when directed under the facility repair and renewal process.
Work may generally occur from 7:00 a.m. to 3:30 p.m., Monday through Saturday, excluding Government holidays. Work outside regular hours requires advance written approval, normally submitted 15 calendar days beforehand, and utility cutovers are to occur outside normal hours unless otherwise directed.
Contractor personnel must comply with installation access and security requirements, including DBIDS registration or limited one-day pass procedures, ongoing background-screening eligibility, badge-return and lost-badge notification requirements, installation smoking restrictions, and applicable radiation-control procedures for radioactive testing equipment.
The project also requires compliance with USACE EM 385-1-1 safety requirements, Government review of designated “G” and “S” submittals, protection of existing facilities and contents, coordination of utility interruptions, construction waste management, commissioning, and submission of final operation, maintenance, and facility data.