Attach A Specification CALHOUN (WMSL 759) DS FQ2 FY27R1.pdf
Posted: Sept. 4, 2026
• Type: .pdf
• Size: 3.43MB
Submit Questions to Government Officer Anonymously
Place your question(s) below. One of our analysts will anonymously submit the question(s) within 8 hours and provide any responses via email once received.
Opportunity Assistant
Hello! Please let me know your questions about this document.
Loading
Save a Question
Customize Generation
We will write a draft based on the below linked information. Add or link more information to improve the draft.
Federal Profile
Select the Federal company profile to use when informing the response based on publicly available data.
Loading federal profile search...
Company Context
Add capability statements, prior responses, or other company materials to customize the response to your business.
Checking for company documents...
Opportunity Context
Add SOWs, attachments, or other files specific to this opportunity.
Checking for opportunity documents...
Link a Pursuit
Optionally associate this draft with an existing pursuit.
Overview
Related Opportunity
Related Agency
Summary
This **Specification for Dockside Repairs**, issued by the **U.S. Coast Guard** for **USCGC CALHOUN (WMSL 759)**, defines the FY2027 dockside availability requirements for inspecting, testing, repairing, modifying, preserving, and supporting the 418-foot National Security Cutter at a Coast Guard facility.
**Revision 1, dated September 3, 2026,** adds Work Item 3 for inspection and testing of the Type 18-08 Talon helicopter landing grid and updates the Government-furnished property, critical-inspection, and reference-document lists.
The specification contains 21 work items, including:
- Draw-out circuit-breaker testing.
- Five-year certification of miscellaneous system relief valves.
- Talon grid inspection and testing.
- Stern-deck slip-resistant covering renewal and tenting.
- Polymeric deck-covering repairs.
- Cleaning, inspection, and partial preservation of fuel, aviation-fuel, water-mist, and potable-water tanks.
- Technical change-order modifications to dewatering, potable-water, dry-provision, HVAC, and weather-deck systems.
- MPAC demister installation.
- Temporary services.
- General welding.
- Fire-prevention support.
The contractor must perform the work in accordance with applicable Coast Guard drawings and technical publications; Surface Forces Logistics Center standard specifications; NAVSEA and NAVAIR requirements; OSHA shipyard standards; NFPA standards; AWS welding codes; ASTM coating and inspection standards; and other cited military and commercial references.
Critical inspection reports for Work Items 1, 3, 4, 5, and 7 through 10 must be completed within the first 25 percent of the availability period.
Government-furnished or loaned items include Talon-grid hardware, a water bladder, a joiner door, and thermostatic switches. The contractor must account for these items and return loaned property to the vessel after completion.
The vessel’s stated principal characteristics include:
- Overall length: 418 feet.
- Maximum beam: 54 feet.
- Design draft: 14.40 feet.
- Displacement: Approximately 3,925 long tons.
- Construction: Aluminum and high-strength steel.
- Propulsion: Combined diesel and gas turbine (CODAG) system with two MTU 20V diesel engines and one GE LM2500 gas turbine.
- Ship-service generators: Three 1,360-kW units.
General requirements apply to all contract work and require compliance with Coast Guard facility procedures, electrical-power controls, welding and fabrication requirements, fire-prevention and response measures, ship-structure preservation standards, temporary-services provisions, environmental and safety rules, and contractor-submitted plans and inspection documentation.
**Revision 1, dated September 3, 2026,** adds Work Item 3 for inspection and testing of the Type 18-08 Talon helicopter landing grid and updates the Government-furnished property, critical-inspection, and reference-document lists.
The specification contains 21 work items, including:
- Draw-out circuit-breaker testing.
- Five-year certification of miscellaneous system relief valves.
- Talon grid inspection and testing.
- Stern-deck slip-resistant covering renewal and tenting.
- Polymeric deck-covering repairs.
- Cleaning, inspection, and partial preservation of fuel, aviation-fuel, water-mist, and potable-water tanks.
- Technical change-order modifications to dewatering, potable-water, dry-provision, HVAC, and weather-deck systems.
- MPAC demister installation.
- Temporary services.
- General welding.
- Fire-prevention support.
The contractor must perform the work in accordance with applicable Coast Guard drawings and technical publications; Surface Forces Logistics Center standard specifications; NAVSEA and NAVAIR requirements; OSHA shipyard standards; NFPA standards; AWS welding codes; ASTM coating and inspection standards; and other cited military and commercial references.
Critical inspection reports for Work Items 1, 3, 4, 5, and 7 through 10 must be completed within the first 25 percent of the availability period.
Government-furnished or loaned items include Talon-grid hardware, a water bladder, a joiner door, and thermostatic switches. The contractor must account for these items and return loaned property to the vessel after completion.
The vessel’s stated principal characteristics include:
- Overall length: 418 feet.
- Maximum beam: 54 feet.
- Design draft: 14.40 feet.
- Displacement: Approximately 3,925 long tons.
- Construction: Aluminum and high-strength steel.
- Propulsion: Combined diesel and gas turbine (CODAG) system with two MTU 20V diesel engines and one GE LM2500 gas turbine.
- Ship-service generators: Three 1,360-kW units.
General requirements apply to all contract work and require compliance with Coast Guard facility procedures, electrical-power controls, welding and fabrication requirements, fire-prevention and response measures, ship-structure preservation standards, temporary-services provisions, environmental and safety rules, and contractor-submitted plans and inspection documentation.