AE Services Industry Day MILCON CW IDIQ MATOC.pptx
Posted: Aug. 27, 2026
• Type: .pptx
• Size: 14.46MB
Submit Questions to Government Officer Anonymously
Place your question(s) below. One of our analysts will anonymously submit the question(s) within 8 hours and provide any responses via email once received.
Opportunity Assistant
Hello! Please let me know your questions about this document.
Loading
Save a Question
Customize Generation
We will write a draft based on the below linked information. Add or link more information to improve the draft.
Federal Profile
Select the Federal company profile to use when informing the response based on publicly available data.
Loading federal profile search...
Company Context
Add capability statements, prior responses, or other company materials to customize the response to your business.
Checking for company documents...
Opportunity Context
Add SOWs, attachments, or other files specific to this opportunity.
Checking for opportunity documents...
Link a Pursuit
Optionally associate this draft with an existing pursuit.
Overview
Related Agency
Summary
This **Industry Day presentation from the U.S. Army Corps of Engineers, Norfolk District** outlines a planned **General Services Architect-Engineer (A-E) Indefinite Delivery/Indefinite Quantity Multiple Award Task Order Contract (IDIQ MATOC)** supporting Civil Works, Military Construction (MILCON), and Sustainment, Restoration, and Modernization (SRM) programs.
The anticipated contract will have approximately six awardees, a shared maximum capacity of **$240 million**, and a **5.5-year ordering period** consisting of a five-year base period and an optional six-month extension. Work will primarily occur within the Norfolk District Area of Responsibility, with potential regional use.
The anticipated scope includes:
- Planning and programming
- Feasibility studies
- Geotechnical investigations
- Permitting
- Charrettes and master planning
- Engineering studies
- Multidisciplinary design
- Estimating
- Surveying
- Site and field investigations
- Drawing and document preparation and review
- Design, operability, and maintenance reviews
- Construction phase services
- Commissioning
- Related studies and reports
The presentation identifies the following evaluation factors:
- Specialized experience and technical competence
- Professional qualifications
- Program management, quality control, and capacity
- Past performance
- Knowledge of locality
- Volume of work as a tie-breaker
Specialized experience must be demonstrated through up to eight recent projects performed as the prime contractor, including both new construction and renovation or rehabilitation of complex vertical facilities and major Civil Works infrastructure.
Relevant technical areas include architecture and spatial design, site engineering, access control, interior design, life-cycle cost analysis, hydrologic and hydraulic modeling, pump stations, surge barriers, and interior drainage systems.
Required key personnel include project managers experienced in vertical construction and Civil Works; licensed architects; registered mechanical, civil, electrical, hydraulic, geotechnical, structural, and fire protection engineers; and a qualified cost estimator.
Resumes are limited to one page per key individual, while additional capacity staff must be shown on the organizational chart. Firms are expected to explain their management approach for schedule control, quality control, surge staffing, backup personnel, concurrent task-order execution, team relationships, and alternative or integrated project delivery methods.
The announced schedule is:
| Milestone | Date |
|---|---|
| Industry feedback due | September 7, 2026 |
| Synopsis publication | September 16, 2026 |
| SF 330 submissions due | October 28, 2026 |
| Interviews | February 2027 |
| MATOC award | June 2027 |
Questions and feedback are to be submitted through ProjNet using project ID **1298** and Quick Add Key **GF7A2E-C7893W**.
The Norfolk District stated that it would not post formal responses but would review submissions when developing the final synopsis.
The anticipated contract will have approximately six awardees, a shared maximum capacity of **$240 million**, and a **5.5-year ordering period** consisting of a five-year base period and an optional six-month extension. Work will primarily occur within the Norfolk District Area of Responsibility, with potential regional use.
The anticipated scope includes:
- Planning and programming
- Feasibility studies
- Geotechnical investigations
- Permitting
- Charrettes and master planning
- Engineering studies
- Multidisciplinary design
- Estimating
- Surveying
- Site and field investigations
- Drawing and document preparation and review
- Design, operability, and maintenance reviews
- Construction phase services
- Commissioning
- Related studies and reports
The presentation identifies the following evaluation factors:
- Specialized experience and technical competence
- Professional qualifications
- Program management, quality control, and capacity
- Past performance
- Knowledge of locality
- Volume of work as a tie-breaker
Specialized experience must be demonstrated through up to eight recent projects performed as the prime contractor, including both new construction and renovation or rehabilitation of complex vertical facilities and major Civil Works infrastructure.
Relevant technical areas include architecture and spatial design, site engineering, access control, interior design, life-cycle cost analysis, hydrologic and hydraulic modeling, pump stations, surge barriers, and interior drainage systems.
Required key personnel include project managers experienced in vertical construction and Civil Works; licensed architects; registered mechanical, civil, electrical, hydraulic, geotechnical, structural, and fire protection engineers; and a qualified cost estimator.
Resumes are limited to one page per key individual, while additional capacity staff must be shown on the organizational chart. Firms are expected to explain their management approach for schedule control, quality control, surge staffing, backup personnel, concurrent task-order execution, team relationships, and alternative or integrated project delivery methods.
The announced schedule is:
| Milestone | Date |
|---|---|
| Industry feedback due | September 7, 2026 |
| Synopsis publication | September 16, 2026 |
| SF 330 submissions due | October 28, 2026 |
| Interviews | February 2027 |
| MATOC award | June 2027 |
Questions and feedback are to be submitted through ProjNet using project ID **1298** and Quick Add Key **GF7A2E-C7893W**.
The Norfolk District stated that it would not post formal responses but would review submissions when developing the final synopsis.
Show All