Search Documents
No Results Found.
No Results Found.
Addendum 02.pdf
Posted: March 16, 2026
• Type: .pdf
• Size: 29.23MB
Submit Questions to Government Officer Anonymously
Place your question(s) below. One of our analysts will anonymously submit the question(s) within 8 hours and provide any responses via email once received.
Opportunity Assistant
Hello! Please let me know your questions about this document.
Loading
Save a Question
Customize Generation
We will write a draft based on the below linked information. Add or link more information to improve the draft.
Federal Profile
Select the Federal company profile to use when informing the response based on publicly available data.
Loading federal profile search...
Company Context
Add capability statements, prior responses, or other company materials to customize the response to your business.
Checking for company documents...
Opportunity Context
Add SOWs, attachments, or other files specific to this opportunity.
Checking for opportunity documents...
Link a Pursuit
Optionally associate this draft with an existing pursuit.
Overview
Related Opportunity
Related Agency
Summary
This Addendum to the Statement of Work for Project Number 621-24-701, titled "EHRM Infrastructure Upgrades Tier 3 DC," dated March 6, 2026, outlines modifications, additions, and deletions to the Project Manual and Construction Drawings.
Notably, it includes signed and sealed drawings for Mechanical and Electrical disciplines. The modifications encompass various sections of the project manual, including the addition of a Standard Fixture & Finish Schedule and an Advanced Utility Metering System, while removing the Facility Lightning Protection section entirely.
Specific changes to the construction drawings are detailed, including revisions to keynotes and placements on various sheets such as HA101 (Known Environmental Hazards) and AE101 (Enlarged Plan for Building 77). Additional notes have been added for general guidance on these sheets.
Furthermore, significant updates include adjustments to electrical diagrams that reference overcurrent protection coordination studies and specifications for UPS systems. The addendum specifies that a total of 92 pages of documentation have been modified or added, with particular attention given to ensuring compliance with safety and quality standards throughout the project.
Notably, it includes signed and sealed drawings for Mechanical and Electrical disciplines. The modifications encompass various sections of the project manual, including the addition of a Standard Fixture & Finish Schedule and an Advanced Utility Metering System, while removing the Facility Lightning Protection section entirely.
Specific changes to the construction drawings are detailed, including revisions to keynotes and placements on various sheets such as HA101 (Known Environmental Hazards) and AE101 (Enlarged Plan for Building 77). Additional notes have been added for general guidance on these sheets.
Furthermore, significant updates include adjustments to electrical diagrams that reference overcurrent protection coordination studies and specifications for UPS systems. The addendum specifies that a total of 92 pages of documentation have been modified or added, with particular attention given to ensuring compliance with safety and quality standards throughout the project.