STATEMENT OF WORK Heat Exchanger Service and Cleaning NOAA SHIP Oscar Dyson – FY 2022 Page | 1 1.0 Abstract 1.1 Purpose: The NOAA Ship Oscar Dyson needs service for five Alfa Laval plate heat exchangers and two Alfa Laval plate distilling units. 2.0 References 2.1 None. 3.0 Government Furnished Material 3.1 None. 4.0 Requirements 4.1 Remove, clean, inspect, re-gasket, and reinstall the following seven heat exchanger units: 4.1.1 DG1 HX – M10M (43 plates) unit# 30105-67643 4.1.2 DG2 HX – M10M (48 plates) unit# 30105-66307 4.1.3 DG3 HX – M10M (48 plates) unit# 30105-67644 4.1.4 DG4 HX – M10M (43 plates) unit# 30105-66299 4.1.5 EVAP1 – P16 (160 plates) unit# N-10413 4.1.6 EVAP2 – P16 (160 plates) unit# N-10600 4.1.7 HYD HX – M10M (34 plates) unit# 30104-27486 4.2 Abide by all state, local, and agency COVID-19 protocols while aboard vessel and providing service. Current guidance is available at: https://www.noaa.gov/content/acquisition-%26-grants/news 4.3 Any additional repairs found to be required will be the subject of a condition found report. 5.0 Quality assurance 5.1 None additional. 6.0 Deliverables 6.1 Period of Performance: 11 Oct 2021 – 3 Dec 2021. STATEMENT OF WORK Heat Exchanger Service and Cleaning NOAA SHIP Oscar Dyson – FY 2022 Page | 2 7.0 Notes 7.1 Cleaning may occur offsite at vendor facility. Vendor is responsible for transporting plates to/from their facility.7.2 Ship’s crew will drain and make systems ready for vendor work. 7.3 Place of delivery: NOAA Ship Oscar DysonC/O Bay Ship & Yacht Co. 2900 Main Street Alameda, CA 94501 END OF STATEMENT OF WORK