Search Vehicles

VISN 8 Architect Engineering MATOC

IDIQ

Description

Provide architectural/engineering services in Florida and Puerto Rico to include master planning; schematic design, design development, construction documents, special studies, risk analysis, field surveying; site and facility investigation; preparation of special conceptual and technical studies; concept and feasibility studies; material investigation and color studies; preparation of engineering studies, analysis, and/or investigation, and preparation of Architectural-Engineering (AE) documents and reports for project documents with associated structural, civil, landscaping, mechanical, electrical, historical, environmental subsurface soil investigations and incidental work; preparation of design documents to include building and ground alteration, maintenance, repair and construction; cost and schedule estimates; and construction period services to include monitoring and evaluating the construction progress.

Overview

Ceiling
$280,000,000
Who Can Use
One Agency
Primary Set Aside
Service Disabled Veteran Owned Small Business Set-Aside (SDVOSBC)
Extent Competed
Full And Open Competition After Exclusion Of Sources
VISN 8 Architect Engineering MATOC awarded by VISN 8: Sunshine Healthcare Network (VISN-8) in November 2023 accepts orders through November 2028. The IDIQ has a reported ceiling of $280,000,000, and as of today, $24,770,499 has been obligated through the vehicle with a total reported backlog of $3,101,617 and funded backlog of $482,046 from all task orders. The IDIQ was awarded with a Service Disabled Veteran Owned Small Business Set-Aside (SDVOSBC) set aside and has a primary NAICS code of 541330.

Award Hierarchy

Vehicle

VISN 8 Architect Engineering MATOC

Indefinite Delivery Vehicles

-

Prime Contracts

-

Subcontracts

-

Status

Period of Performance

11/20/23

Start Date

11/19/28

Ordering Period End Date
37.0% Complete

Task Order Obligations and Backlog

$24.8M

Total Obligated

$25.3M

Current Award

$27.9M

Potential Award
89% Funded

$482.0K

Funded Backlog

$3.1M

Total Backlog
Vehicle Award Share

Contractors with greatest percentage of obligations for VISN 8 Architect Engineering MATOC

Radar chart of market share on VISN 8 Architect Engineering MATOC

Vehicle Award Share

Federal Award Analysis

VISN 8 Architect Engineering MATOC contract spending

$-

Contracts

$-

Subcontracts

$-

Grants

$-

Subgrants

$-

Total

Interactive Stacked Bar Chart


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating
Year Contracts Subcontracts Grants Subgrants


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating

Awardees

VISN 8 Architect Engineering MATOC awardees

Contract Awards

VISN 8 Architect Engineering MATOC task orders

Subcontract Awards

VISN 8 Architect Engineering MATOC subcontracts