Search Vehicles

Rapid Acquisition Prototyping Integration and Development (RAPID) MAC

IDIQ

Description

Provide NAWCAD WOLF engineering design, tailored systems engineering, and product acquisition in the development, integration, and fielding of solutions for warfighting capability gaps. The scope includes the application of rapid development, rapid prototyping, and organic Lead Systems Integration (oLSI) in the development of product-based solutions in areas to include Combat Integration & Identification Systems, Ship & Air Integrated Warfare Systems, Special Communications Mission Solutions, Air Traffic Control & Landing Systems, Airborne Systems Integration, and Integrated Command and Control.

Pool 1: Systems Accreditation and Certification (Set-Aside Pool):
This focus area includes the identification and analysis of information technologies, cyber resiliency, security, risk posture, and documentation development in support of cyber accreditation and certification for information systems and Command, Control, Communications, Computers, Combat Systems, Intelligence, Surveillance, and Reconnaissance (C5ISR) systems. Efforts range across the lifecycle of the projects from cyber requirements generation, cyber hardening, cyber auditing, documentation development, accreditation, to continuous monitoring of new or existing systems. Cost, schedule, performance, and risk shall be maintained and reported throughout the duration of the efforts.

Pool 2: Command and Control (C2) Solutions:
This focus area is composed of tasking to support arrangement of personnel, equipment, communications, facilities, and procedures employed in planning, directing, coordinating, and controlling forces and operations. Including requirements analysis, evaluation, studies and analysis, cyber hardening, engineering design, configuration management, prototyping, integration, production, test and evaluation, logistical support, training, documentation, and fielding of systems encompassing communications systems, networking, and computing technologies. Efforts can range from new technology insertion to retrofit of existing systems into modular and/or fixed infrastructure systems. Cost, schedule, performance, and risk shall be maintained and reported throughout the duration of the efforts.

Pool 3: Aviation Systems Development and Operations:
This focus area includes requirements analysis, evaluation, studies and analysis, cyber hardening, engineering design, configuration management, prototyping, integration, test and evaluation, logistical support, documentation, airworthiness, and flight operations of manned and unmanned systems to support development, demonstration, and operations of various technologies. Efforts could include installation of new technologies into new or existing airframes, verification, demonstration and evaluation, to sustained operations. Cost, schedule, performance, and risk shall be maintained and reported throughout the duration of the efforts.

Pool 4: Shipboard Combat Systems
This focus area includes development, integration, testing, documentation, and fielding of various technologies onto shipboard combat systems. Efforts can range from new technology insertion to retrofit of existing systems. Cost, schedule, performance, and risk shall be maintained and reported throughout the duration of the efforts.

Pool 5: Embarkable Systems:
This focus area includes requirements analysis, evaluation, studies and analysis, cyber hardening, engineering design, configuration management, prototyping, integration, production, test and evaluation, logistical support, training, documentation, and fielding of Command, Control, Communications, Computers, Combat Systems, Surveillance and Reconnaissance technologies. Efforts can range from new technology insertion to retrofit of existing systems into man pack, transit case, vehicle, or fixed infrastructure systems. Cost, schedule, performance, and risk shall be maintained and reported throughout the duration of the efforts.

Pool 6: Airborne Mission Systems:
This focus area includes requirements analysis, evaluation, studies and analysis, cyber hardening, engineering design, configuration management, database support, integration, production, test and evaluation, logistical support, training, documentation, airworthiness, flight operations, and fielding of Airborne Mission Systems to the warfighter. Efforts can range from new technology insertion to retrofit of existing systems onto manned and unmanned air vehicles, ground or ship based support systems, or man transportable systems. Cost, schedule, performance, and risk shall be maintained and reported throughout the duration of the efforts.

Overview

Ceiling
$249,720,364
Who Can Use
One Agency
Primary Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition
Rapid Acquisition Prototyping Integration and Development (RAPID) MAC awarded by NAWC Aircraft Division (NAWCAD) in March 2022 accepts orders through March 2027. The IDIQ has a reported ceiling of $249,720,364, and as of today, $4,653,769 has been obligated through the vehicle with a total reported backlog of $77,426,741 and funded backlog of $13,940,193 from all task orders. The IDIQ was awarded with a Small Business Set Aside - Total (SBA) set aside and has a primary NAICS code of 541330.

Award Hierarchy

Vehicle

Rapid Acquisition Prototyping Integration and Development (RAPID) MAC

Indefinite Delivery Vehicles

-

Prime Contracts

-

Subcontracts

-

Status

Period of Performance

3/4/22

Start Date

3/3/27

Ordering Period End Date
72.0% Complete

Task Order Obligations and Backlog

$4.7M

Total Obligated

$18.6M

Current Award

$82.1M

Potential Award
6% Funded

$13.9M

Funded Backlog

$77.4M

Total Backlog
Vehicle Award Share

Contractors with greatest percentage of obligations for Rapid Acquisition Prototyping Integration and Development (RAPID) MAC

Radar chart of market share on Rapid Acquisition Prototyping Integration and Development (RAPID) MAC

Vehicle Award Share

Federal Award Analysis

Rapid Acquisition Prototyping Integration and Development (RAPID) MAC contract spending

$-

Contracts

$-

Subcontracts

$-

Grants

$-

Subgrants

$-

Total

Interactive Stacked Bar Chart


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating
Year Contracts Subcontracts Grants Subgrants


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating

Awardees

Rapid Acquisition Prototyping Integration and Development (RAPID) MAC awardees

Contract Awards

Rapid Acquisition Prototyping Integration and Development (RAPID) MAC task orders

Subcontract Awards

Rapid Acquisition Prototyping Integration and Development (RAPID) MAC subcontracts