Puerto Rico Power System Stabilization MATOC

IDIQ

Description

Provide temporary emergency power augmentation and on related repairs of generation facilities to stabilize the PR power system as a result of Hurricane Fiona. Power generation services consist of rental and delivery of generator units; electrical connection of the generator output to the power grid; installation of new, or modification/repair of existing, power monitoring and control systems; testing and commissioning of the power generation and electrical systems; and operation and maintenance of the installed systems, to include fueling. Ancillary activities will include the repair, replacement, installation, operation, and maintenance of power transmission components as necessary to connect the contract-supplied temporary power or power generated from other sources to the grid; to monitor, control, and protect new and existing components of the power generation and transmission system; and to improve the stability of the grid.

Overview

Puerto Rico Power System Stabilization MATOC awarded by USACE Savannah District (SAS) in September 2023 accepts orders through September 2028. The IDIQ has a reported ceiling of $5,000,000,000, and as of today, $15,000 has been obligated through the vehicle. The IDIQ was awarded full & open and has a primary NAICS code of 221112.

Award Hierarchy

Vehicle

Puerto Rico Power System Stabilization MATOC

Indefinite Delivery Vehicles

-

Prime Contracts

-

Subcontracts

-

Status

Period of Performance

9/28/23

Start Date

9/27/28

Ordering Period End Date
32.0% Complete

Task Order Obligations

$15.0K

Total Obligated

$15.0K

Current Award

$15.0K

Potential Award
100% Funded
Vehicle Award Share

Contractors with greatest percentage of obligations for Puerto Rico Power System Stabilization MATOC

Radar chart of market share on Puerto Rico Power System Stabilization MATOC

Vehicle Award Share

Federal Award Analysis

Puerto Rico Power System Stabilization MATOC contract spending

$-

Contracts

$-

Subcontracts

$-

Grants

$-

Subgrants

$-

Total

Interactive Stacked Bar Chart


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating
Year Contracts Subcontracts Grants Subgrants


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating

Awardees

Puerto Rico Power System Stabilization MATOC awardees

Contract Awards

Puerto Rico Power System Stabilization MATOC task orders

Subcontract Awards

Puerto Rico Power System Stabilization MATOC subcontracts