Search Vehicles

MEDCOM Design-Build Two-Phase Design-Build IDIQ

IDIQ

Description

The primary purpose of this contract is to provide a full range of construction services to include design/build renovation, repair and new construction for MEDCOM medical treatment facilities (MTF) and medical research laboratory facilities to provide quick, cost effective responses to requirements for Army Medical Command (MEDCOM) facilities, primarily at military installations on behalf of the U.S. Army Corps of Engineers Mobile District to support MEDCOM Program Nationwide.. Potential projects include, but are not limited to, work inside both permanent and temporary facilities some of which include the following types: medical centers, community hospitals, medical clinics, dental treatment facilities, veterinary treatment facilities, medical office buildings, medical research laboratory facilities, medical warehouses, and various other facility types in direct support of the MEDCOM mission. As the facilities will typically be in full operation, the contractor will be required to minimize interference with the daily operation of the facilities and will be required to implement infection control processes and to comply with Joint Commission requirements for construction work in occupied medical facilities.

Overview

MEDCOM Design-Build Two-Phase Design-Build IDIQ awarded by USACE Mobile District (SAM) in March 2021 accepts orders through August 2024. The IDIQ has a reported ceiling of $230,000,000, and as of today, $232,847,928 has been obligated through the vehicle with a total reported backlog of $7,190,621. The IDIQ was awarded full & open and has a primary NAICS code of 236220.

Award Hierarchy

Vehicle

MEDCOM Design-Build Two-Phase Design-Build IDIQ

Indefinite Delivery Vehicles

-

Prime Contracts

-

Subcontracts

-

Status

Period of Performance

3/1/21

Start Date

8/29/24

Ordering Period End Date
100% Complete

Task Order Obligations and Backlog

$232.8M

Total Obligated

$232.8M

Current Award

$240.0M

Potential Award
97% Funded

$0.0

Funded Backlog

$7.2M

Total Backlog
Vehicle Award Share

Contractors with greatest percentage of obligations for MEDCOM Design-Build Two-Phase Design-Build IDIQ

Radar chart of market share on MEDCOM Design-Build Two-Phase Design-Build IDIQ

Vehicle Award Share

Federal Award Analysis

MEDCOM Design-Build Two-Phase Design-Build IDIQ contract spending

$-

Contracts

$-

Subcontracts

$-

Grants

$-

Subgrants

$-

Total

Interactive Stacked Bar Chart


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating
Year Contracts Subcontracts Grants Subgrants


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating

Awardees

MEDCOM Design-Build Two-Phase Design-Build IDIQ awardees

Contract Awards

MEDCOM Design-Build Two-Phase Design-Build IDIQ task orders

Subcontract Awards

MEDCOM Design-Build Two-Phase Design-Build IDIQ subcontracts