Search Vehicles

Infrastructure Needs Program Construction II

IDIQ

Description

Provide construction, rehabilitation and/or improvement of infrastructure works throughout the West Bank and, if conditions permit, Gaza. The scope of work includes:
1. Transportation networks such as primary and secondary roads, bridges and/or other transportation infrastructure;
2. Water systems including the supply, storage, treatment, transmission and/or distribution of water;
3. Sanitation infrastructure including solid waste management and disposal, wastewater treatment and reuse, pollution control, and/or ecological sanitation;
4. Public Buildings including schools, clinics, health facilities, government buildings and facilities, sports facilities, warehouses, food storage facilities, youth centers, and/or other public buildings designed to benefit the public interest;
5. Electric Power sector infrastructure to include alternative, sustainable and/or traditional forms of power generation (such as wind turbines, photovoltaic, solar thermal, geothermal, and/or fossil-fuel-fired thermal power plants), and/or electricity transmission & distribution systems in the West Bank. Work in this sector is included to anticipate possible needs, but does not represent a major work item at this time;
6. Design and implementation of Operations & Maintenance (O&M) programs and activities for infrastructure facilities in the West Bank; this may include servicing well-pump stations and replacing/upgrading faulty equipment such as pump motors and variable frequency drives; providing critically needed maintenance to water transmission and distribution infrastructure; developing and managing road repair units to transition to the PA, and providing any other O&M support needed for eventual transition to the Palestinian Authority, such as training and other capacity building efforts related to the O&M of facilities, in order to ensure that installed infrastructure can function reliably over its lifetime. This can include actual multi year O&M contracts for facilities in the West Bank.
7. USAID may identify needed procurements to support USAID objectives which shall be conducted by INP II IQC Contractors on a competitive basis. These may include the procurement of equipment including but not limited to construction heavy equipments, electrical, mechanical and any other equipment identified at a later stage by USAID.

Overview

Ceiling
$750,000,000
Who Can Use
One Agency
Primary Set Aside
None
Extent Competed
Full And Open Competition
Infrastructure Needs Program Construction II awarded by U.S. Mission to West Bank and Gaza in December 2011 accepts orders through December 2016. The IDIQ has a reported ceiling of $750,000,000, and as of today, $253,127,393 has been obligated through the vehicle with a total reported backlog of $3,898,091 and funded backlog of $3,898,091 from all task orders, though the ordering period has ended so backlog may not be realized. The IDIQ was awarded full & open and has a primary NAICS code of 532412.

Award Hierarchy

Vehicle

Infrastructure Needs Program Construction II

Indefinite Delivery Vehicles

-

Prime Contracts

-

Subcontracts

-

Status

Period of Performance

12/29/11

Start Date

12/29/16

Ordering Period End Date
100% Complete

Task Order Obligations and Backlog

$253.1M

Total Obligated

$257.0M

Current Award

$257.0M

Potential Award
98% Funded

$3.9M

Funded Backlog

$3.9M

Total Backlog
Vehicle Award Share

Contractors with greatest percentage of obligations for Infrastructure Needs Program Construction II

Radar chart of market share on Infrastructure Needs Program Construction II

Vehicle Award Share

Federal Award Analysis

Infrastructure Needs Program Construction II contract spending

$-

Contracts

$-

Subcontracts

$-

Grants

$-

Subgrants

$-

Total

Interactive Stacked Bar Chart


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating
Year Contracts Subcontracts Grants Subgrants


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating

Awardees

Infrastructure Needs Program Construction II awardees

Contract Awards

Infrastructure Needs Program Construction II task orders

Subcontract Awards

Infrastructure Needs Program Construction II subcontracts