Search Vehicles

IIJA Great Lakes and Ohio River A/E Design MATOC

IDIQ

Description

Provide a variety of Architect/Engineer services primarily for civil works projects located within the LRD geographical boundaries.

A/E services may consist of the following activities: preparation of construction solicitations for design-bid-build (complete design) projects and design build RFPs (request for proposals); concept level designs and engineering feasibility studies; master planning; site investigation/assessment of existing conditions; value engineering services; engineering services during construction (shop drawing review, site inspection, etc.); design of demolition or deconstruction; hazardous materials survey, analysis, and abatement methodology; sustainable design; construction cost estimates and schedules; technical studies/analysis in support of design for new construction and renovation; comprehensive planning for future construction requirements at civil works locations; coordination and attainment of local, state and federal permits; support and coordination in the development of utility agreements; and utility investigations.

Additional A/E support services may include: geotechnical studies; environmental compliance; National Environmental Policy Act documentation; controlled waste and flammable storage design; asbestos, lead and PCB surveys and/or abatement. Other A/E services beyond traditional design may include: site selection; American Land Title Association surveys; deed and title services; and facility assessments.

Overview

Ceiling
$200,000,000
Primary Sponsoring Agency
Who Can Use
One Agency
Primary Set Aside
8(A) Competed (8A)
Extent Competed
Full And Open Competition After Exclusion Of Sources
IIJA Great Lakes and Ohio River A/E Design MATOC awarded by Coast Guard (USCG) in May 2023 accepts orders through August 2028. The IDIQ has a reported ceiling of $200,000,000, and as of today, $15,869,048 has been obligated through the vehicle with a total reported backlog of $34,052,384 and funded backlog of $22,396,100 from all task orders. The IDIQ was awarded with a 8(A) Competed (8A) set aside and has a primary NAICS code of 541519.

Award Hierarchy

Vehicle

IIJA Great Lakes and Ohio River A/E Design MATOC

Indefinite Delivery Vehicles

-

Prime Contracts

-

Subcontracts

-

Status

Period of Performance

5/17/23

Start Date

8/16/28

Ordering Period End Date
50.0% Complete

Task Order Obligations and Backlog

$15.9M

Total Obligated

$38.3M

Current Award

$49.9M

Potential Award
32% Funded

$22.4M

Funded Backlog

$34.1M

Total Backlog
Vehicle Award Share

Contractors with greatest percentage of obligations for IIJA Great Lakes and Ohio River A/E Design MATOC

Radar chart of market share on IIJA Great Lakes and Ohio River A/E Design MATOC

Vehicle Award Share

Federal Award Analysis

IIJA Great Lakes and Ohio River A/E Design MATOC contract spending

$-

Contracts

$-

Subcontracts

$-

Grants

$-

Subgrants

$-

Total

Interactive Stacked Bar Chart


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating
Year Contracts Subcontracts Grants Subgrants


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating

Awardees

IIJA Great Lakes and Ohio River A/E Design MATOC awardees

Contract Awards

IIJA Great Lakes and Ohio River A/E Design MATOC task orders

Subcontract Awards

IIJA Great Lakes and Ohio River A/E Design MATOC subcontracts