DOT Highway and Bridge Design and Engineering
IDIQ
Overview
Ceiling
$15,000,000
Primary Sponsoring Agency
Who Can Use
One Agency
Primary NAICS
Primary PSC
Primary Set Aside
None
Extent Competed
Full And Open Competition
DOT Highway and Bridge Design and Engineering awarded by Eastern Federal Lands Highway Division (EFLHD) in June 2012 accepts orders through March 2018.
The IDIQ has a reported ceiling of $15,000,000, and as of today, $7,821,567 has been obligated through the vehicle
with a total reported backlog of $140,636 and funded backlog of $140,636 from all task orders, though the ordering period has ended so backlog may not be realized.
The IDIQ was awarded
full & open and has a primary NAICS code of 541330.
Status
Period of Performance
6/13/12
Start Date
3/3/18
Ordering Period End Date
Task Order Obligations and Backlog
$7.8M
Total Obligated
$8.0M
Current Award
$8.0M
Potential Award
$140.6K
Funded Backlog
$140.6K
Total Backlog
Vehicle Award Share
Contractors with greatest percentage of obligations for DOT Highway and Bridge Design and Engineering
Vehicle Award Share
Federal Award Analysis
DOT Highway and Bridge Design and Engineering contract spending
$-
Contracts
$-
Subcontracts
$-
Grants
$-
Subgrants
$-
Total
No Results
Calculating
Calculating
No Results
Calculating
Calculating
No Results
Calculating
Calculating
Year | Contracts | Subcontracts | Grants | Subgrants |
---|
No Results
Calculating
Calculating
No Results
Calculating
Calculating
Awardees
DOT Highway and Bridge Design and Engineering awardees
Contract Awards
DOT Highway and Bridge Design and Engineering task orders
Subcontract Awards