Search Vehicles

Build-To-Print Machine Shop Requirements

IDIQ

Description

Provide machined parts to support Armed Helo Weapons Systems and various ground and air activities in support of the United States Navy. This procurements performance requirements are based on, but not limited to, Fixed Forward Firing Weapons (FFFW) and Interface Unit Automatic Data Processor (IUADP) in support of the Naval Surface Warfare Center (NSWC), Crane Division.

Overview

Ceiling
$49,900,000
Who Can Use
One Agency
Primary NAICS
Primary Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Build-To-Print Machine Shop Requirements awarded by NSWC Crane Division in September 2014 accepts orders through September 2019. The IDIQ has a reported ceiling of $49,900,000, and as of today, $12,970,569 has been obligated through the vehicle. The IDIQ was awarded with a Small Business Set Aside - Total (SBA) set aside and has a primary NAICS code of 332710.

Award Hierarchy

Vehicle

Build-To-Print Machine Shop Requirements

Indefinite Delivery Vehicles

-

Prime Contracts

-

Subcontracts

-

Status

Period of Performance

9/22/14

Start Date

9/22/19

Ordering Period End Date
100% Complete

Task Order Obligations

$13.0M

Total Obligated

$13.0M

Current Award

$13.0M

Potential Award
100% Funded
Vehicle Award Share

Contractors with greatest percentage of obligations for Build-To-Print Machine Shop Requirements

Radar chart of market share on Build-To-Print Machine Shop Requirements

Vehicle Award Share

Federal Award Analysis

Build-To-Print Machine Shop Requirements contract spending

$-

Contracts

$-

Subcontracts

$-

Grants

$-

Subgrants

$-

Total

Interactive Stacked Bar Chart


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating
Year Contracts Subcontracts Grants Subgrants


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating


No Results
Calculating
Calculating

Awardees

Build-To-Print Machine Shop Requirements awardees

Contract Awards

Build-To-Print Machine Shop Requirements task orders

Subcontract Awards

Build-To-Print Machine Shop Requirements subcontracts