Sub Description
Change Item No. CI007: Secondary Containment for Oil Filled Transformers
Contractor shall furnish all labor, equipment, materials and incidentals necessary to design provide for secondary containment for the six (6) oil filed transformers on the CP-6 UEDS project site.
The following transformers are pad mounted oil filled transformers:
TS-1 and TS-2 Near the secondary substation,
TS-S1A and TS-S1B are near the MSUS building,
TS-5 is inside the SATCOM fence line,
TS-6 is near the helicopter pad above the entrance to the tunnel.
Containment must meet all Federal, State, and Local Regulations.
The containment cannot have any automatic sumps.
The containment will need to have a drain that can be manually opened and closed after inspection, or a way to deal with rain water accumulation in the containment while being able to contain an oil release.
Sub Awardee
Total Awarded
$536,633.54
Most Recent Award Date
Jan. 11, 2018
Place of Performance
Boise, Idaho 83709 United States
Prime Awardee
Prime Project Title
Upgrade Electrical Phase 1A
Prime Award
Award Hierarchy
Definitive Contract
Subcontract
S15150000-02
Related Subcontracts
Subcontracts under the same prime contract
Subcontract History
Disclosed subcontract actions
Prime Contract Details
Prime Status
Period of Performance
9/23/14
Start Date
10/31/19
Current End Date
10/31/19
Potential End Date
Obligations
$14.0M
Total Obligated
$14.0M
Current Value
$14.0M
Potential Value
Prime Overview
Original Description
UEDS - PHASE 1A
Awarding / Funding Agency
NAICS
Not Reported
PSC Category
Pricing
Fixed Price
Place of Performance
Schofield Barracks, HI United States
Set Aside
None
Extent Competed
Not Available For Competition