Search Subcontracts

00008210

Overview

Sub Description
ASTRA'S MAIN RESPONSIBILITY IS TO ENSURE THAT THE TIEGCM AND OTHER MODEL OUTPUT IS SUFFICIENT TO SUPPORT THE ICON MISSION. TO SUPPORT THE ICON MISSION, ASTRA WILL PROVIDE THE FOLLOWING EXPERTISE: THE USE OF VARIOUS ATMOSPHERIC MODELS, THE PROPAGATION OF WAVES AND TIDES FROM THE LOWER ATMOSPHERE TO THE IONOSPHERE AND THERMOSPHERE; DATA ANALYSIS, AND VARIOUS ATMOSPHERIC MODELS INCLUDING IDA4D;THE USE OF TIEGCM,AMIE, IDA4D, AND SAML3.
Total Awarded
$4,254,417.15
Most Recent Award Date
Nov. 22, 2024
Place of Performance
Boulder, Colorado 80301-2829 United States
Prime Project Title
Ionospheric CONnection Explorer (ICON)
Prime Award

Award Hierarchy

Definitive Contract

NNG12FA45C

Subcontract

00008210

Related Subcontracts

Subcontracts under the same prime contract

Subcontract History

Disclosed subcontract actions

Prime Contract Details


Prime Status

Period of Performance
1/11/12
Start Date
8/31/25
Current End Date
8/31/25
Potential End Date
98.0% Complete

Obligations
$182.1M
Total Obligated
$182.1M
Current Value
$182.1M
Potential Value
100% Funded

Prime Overview

Original Description
PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR.
Awarding / Funding Agency
NAICS
Not Reported
Pricing
Cost No Fee
Place of Performance
Berkeley, CA 94704 United States
Set Aside
None
Extent Competed
Full And Open Competition
Last Modified: 11/22/24