SC23005-008
Overview
Sub Description
Erosion Control
Sub Awardee
Total Awarded
$116,550.00
Most Recent Award Date
Aug. 28, 2023
Place of Performance
Westfir, Oregon 97492-9740 United States
Prime Awardee
Prime Project Title
None
Prime Award
Award Hierarchy
Definitive Contract
Subcontract
SC23005-008
Related Subcontracts
Subcontracts under the same prime contract
Subcontract History
Disclosed subcontract actions
Prime Contract Details
Prime Status
Period of Performance
4/17/23
Start Date
12/5/25
Current End Date
12/19/25
Potential End Date
Obligations
$19.9M
Total Obligated
$19.9M
Current Value
$19.9M
Potential Value
Prime Overview
Original Description
Or DOT 18(1), OR58: coast fork willamette river to lower salt cr bridges. The primary objective of this project is to seismically retrofit 3 bridges on OR-58 between US-97 and I-5. The scope of work consists of structure repair and seismic upgrades, as well as bridge assessment and renovation activities including inspecting and assessing multiple bridges, hazardous materials inspections for Asbestos-Containing Building Materials (ACBM) and Lead-Based Paint (LBP), laboratory analysis of structural samples, and implementation of safety measures for hazardous materials management in accordance with EPA and OSHA guidelines. Additional work includes surveying, furnishing cfrp strengthening systems, painting and lead abatement, concrete core drilling, rebar placement, asphalt work, erosion control, and shotcrete shoring and micropiles.
Awarding / Funding Agency
NAICS
Not Reported
Pricing
Fixed Price
Place of Performance
Westfir, OR 97492 United States
Set Aside
None
Extent Competed
Full And Open Competition