Remote Bridge Upgrades for Multiple Milwaukee River Structures
ID: OFFICIAL NOTICE 59-1-2026
• State: Wisconsin
Opportunity Assistant
Loading
Description
Background
The City of Milwaukee's Office of Equity & Inclusion is issuing a solicitation for the Remote Bridge Upgrades for Multiple Milwaukee River Structures. This initiative aims to enhance the infrastructure and ensure safety and accessibility across various bridge structures in the city. The contract emphasizes compliance with Small Business Enterprise (SBE) requirements, promoting participation from certified SBE firms.
Work Details
The contractor will be responsible for performing upgrades on multiple bridge structures over the Milwaukee River. Specific tasks include: assessing current structural integrity, implementing necessary repairs, upgrading safety features, and ensuring compliance with local regulations.
All work must align with the standards set forth by the City of Milwaukee's Department of Public Works. The contractor must also engage SBE-certified subcontractors for a portion of the work, as detailed in the SBE Compliance Plan (Form A).
Period of Performance
The contract will be performed over a period of 12 months from the date of award.
Place of Performance
The work will take place at various bridge locations along the Milwaukee River within the City of Milwaukee.
Bidder Requirements
Bidders must provide an active (non-expired) certificate confirming Small Business Enterprise (SBE) certification issued by the City of Milwaukee Office of Equity and Inclusion for each SBE firm included in their proposal. Additionally, all subcontractors must be SBE-certified at the time of bid opening or RFP closing.
Failure to comply with these requirements may render bids unresponsive.
The City of Milwaukee's Office of Equity & Inclusion is issuing a solicitation for the Remote Bridge Upgrades for Multiple Milwaukee River Structures. This initiative aims to enhance the infrastructure and ensure safety and accessibility across various bridge structures in the city. The contract emphasizes compliance with Small Business Enterprise (SBE) requirements, promoting participation from certified SBE firms.
Work Details
The contractor will be responsible for performing upgrades on multiple bridge structures over the Milwaukee River. Specific tasks include: assessing current structural integrity, implementing necessary repairs, upgrading safety features, and ensuring compliance with local regulations.
All work must align with the standards set forth by the City of Milwaukee's Department of Public Works. The contractor must also engage SBE-certified subcontractors for a portion of the work, as detailed in the SBE Compliance Plan (Form A).
Period of Performance
The contract will be performed over a period of 12 months from the date of award.
Place of Performance
The work will take place at various bridge locations along the Milwaukee River within the City of Milwaukee.
Bidder Requirements
Bidders must provide an active (non-expired) certificate confirming Small Business Enterprise (SBE) certification issued by the City of Milwaukee Office of Equity and Inclusion for each SBE firm included in their proposal. Additionally, all subcontractors must be SBE-certified at the time of bid opening or RFP closing.
Failure to comply with these requirements may render bids unresponsive.
Loading Map
Loading Map
Overview
Opportunity ID
OFFICIAL NOTICE 59-1-2026
Response Deadline
May 19, 2026
Past Due
Date Posted
May 4, 2026
Source
Q&A Deadline
Vendor questions/clarifications can be directed to the Office of Equity and Inclusion at oei@milwaukee.gov, and additional questions can be addressed to the DPW Contract Office at DPWBids@milwaukee.gov. The text does not specify a separate submission platform or a deadline for questions.
Set Aside Preferences
Small Business
Est. Value Range
Experimental
$1,200,000 - $4,800,000
(AI estimate)
Agency Distribution
Low
On 5/4/26 City of Milwaukee Public Works in Wisconsin issued Remote Bridge Upgrades for Multiple Milwaukee River Structures with ID OFFICIAL NOTICE 59-1-2026 due 5/19/26.
Contacts
Documents
Posted documents for Remote Bridge Upgrades for Multiple Milwaukee River Structures
Opportunity Assistant
AI Analysis
AI Generate