Lake Country School District Site Improvements
ID: LCSD-10172025-2 • State: Wisconsin
Opportunity Assistant
Loading
Description
Background
The Lake Country School District is seeking a construction partner to undertake capital improvement projects as part of a district-wide infrastructure improvement initiative linked to the April 2024 capital referendum. The goal is to collaborate with a single prime contractor responsible for managing all aspects of the project, including trades and subcontractors, while ensuring compliance with local approvals and permitting requirements.
Work Details
The contractor will be responsible for the following scope of work:
1. Asphalt Replacement - Parking Lot: Mill and replace existing asphalt; restripe for efficiency.
2. Asphalt Replacement - Drive Lane: Mill and replace existing asphalt; accommodate delivery and bus traffic; include widening in specified areas.
3. Asphalt Replacement - Playground: Mill and replace existing playground surface; coordinate final striping with the District.
4. Concrete Sidewalk and Curb/Gutter Replacement: Replace existing sidewalks and curbs with new concrete (synthetically reinforced, 4,000psi).
5. Rolled Face Concrete Curb: Install new roll faced concrete curb matching existing surfaces.
6. Concrete Driveway Installation: Install a new 12' wide concrete driveway matching existing surfaces.
7. Concrete Flume: Install new flume coordinating with stormwater management.
8. Lighting Replacement: Replace light poles and fixtures with LED options, integrating into the building's lighting control system.
9. Additional Scope includes vehicle circulation signage installation and landscape restoration.
Period of Performance
Contract award is expected in December 2025, with planning and procurement from January to May 2026. Construction is set to commence on June 8, 2026, with completion anticipated by August 2026.
Place of Performance
Lake Country School District, located at 1800 Vettelson Road, Hartland, WI 53029.
Bidder Requirements
Contractors must submit an itemized cost proposal that includes all fees, materials, labor, services, and rentals necessary to complete the outlined work. They are also required to attend a pre-proposal conference for site access and clarification of project details.
The Lake Country School District is seeking a construction partner to undertake capital improvement projects as part of a district-wide infrastructure improvement initiative linked to the April 2024 capital referendum. The goal is to collaborate with a single prime contractor responsible for managing all aspects of the project, including trades and subcontractors, while ensuring compliance with local approvals and permitting requirements.
Work Details
The contractor will be responsible for the following scope of work:
1. Asphalt Replacement - Parking Lot: Mill and replace existing asphalt; restripe for efficiency.
2. Asphalt Replacement - Drive Lane: Mill and replace existing asphalt; accommodate delivery and bus traffic; include widening in specified areas.
3. Asphalt Replacement - Playground: Mill and replace existing playground surface; coordinate final striping with the District.
4. Concrete Sidewalk and Curb/Gutter Replacement: Replace existing sidewalks and curbs with new concrete (synthetically reinforced, 4,000psi).
5. Rolled Face Concrete Curb: Install new roll faced concrete curb matching existing surfaces.
6. Concrete Driveway Installation: Install a new 12' wide concrete driveway matching existing surfaces.
7. Concrete Flume: Install new flume coordinating with stormwater management.
8. Lighting Replacement: Replace light poles and fixtures with LED options, integrating into the building's lighting control system.
9. Additional Scope includes vehicle circulation signage installation and landscape restoration.
Period of Performance
Contract award is expected in December 2025, with planning and procurement from January to May 2026. Construction is set to commence on June 8, 2026, with completion anticipated by August 2026.
Place of Performance
Lake Country School District, located at 1800 Vettelson Road, Hartland, WI 53029.
Bidder Requirements
Contractors must submit an itemized cost proposal that includes all fees, materials, labor, services, and rentals necessary to complete the outlined work. They are also required to attend a pre-proposal conference for site access and clarification of project details.
Overview
Opportunity ID
LCSD-10172025-2
Response Deadline
Nov. 17, 2025
Past Due
Date Posted
Oct. 17, 2025
Est. Value Range
Experimental
$5,000,000 - $15,000,000
(AI estimate)
Agency Distribution
High
Source
On 10/17/25 Lake Country School District in Wisconsin issued Lake Country School District Site Improvements with ID LCSD-10172025-2 due 11/17/25.