Brayton Lot Development Project
ID: 14001-0-2025 • State: Wisconsin
Opportunity Assistant
Loading
Description
Background
The City of Madison, through its Economic Development Division, is seeking proposals for the Brayton Lot Development Project. This initiative aims to redevelop Block 113, located at 1 South Butler Street, which currently serves as a surface parking lot.
The project is part of the City’s broader mission to enhance community services and economic growth while adhering to Federal Transit Administration (FTA) requirements due to prior use of the site as part of the Bus Rapid Transit (BRT) system construction.
Work Details
The Brayton Lot Development Project will involve creating a mixed-use development that includes residential units, retail spaces, and potentially commercial office space. The project must meet FTA Joint Development requirements and aims to increase housing density, enhance transit usage, and provide additional amenities in downtown Madison.
Specific project goals include:
1. Utilizing City-owned parcels to expand the tax base by replacing the existing parking lot.
2. Unlocking development potential through a mix of uses.
3. Increasing economic activity and housing options.
4. Complying with sustainability standards and providing affordable housing options.
5. Ensuring that any new development benefits transit by increasing demand in the area.
Period of Performance
The contract period will commence upon execution and is expected to align with the project's development timeline, which will be detailed in proposals submitted by bidders.
Place of Performance
The work will be performed at Block 113, located at 1 South Butler Street in downtown Madison, Wisconsin.
The City of Madison, through its Economic Development Division, is seeking proposals for the Brayton Lot Development Project. This initiative aims to redevelop Block 113, located at 1 South Butler Street, which currently serves as a surface parking lot.
The project is part of the City’s broader mission to enhance community services and economic growth while adhering to Federal Transit Administration (FTA) requirements due to prior use of the site as part of the Bus Rapid Transit (BRT) system construction.
Work Details
The Brayton Lot Development Project will involve creating a mixed-use development that includes residential units, retail spaces, and potentially commercial office space. The project must meet FTA Joint Development requirements and aims to increase housing density, enhance transit usage, and provide additional amenities in downtown Madison.
Specific project goals include:
1. Utilizing City-owned parcels to expand the tax base by replacing the existing parking lot.
2. Unlocking development potential through a mix of uses.
3. Increasing economic activity and housing options.
4. Complying with sustainability standards and providing affordable housing options.
5. Ensuring that any new development benefits transit by increasing demand in the area.
Period of Performance
The contract period will commence upon execution and is expected to align with the project's development timeline, which will be detailed in proposals submitted by bidders.
Place of Performance
The work will be performed at Block 113, located at 1 South Butler Street in downtown Madison, Wisconsin.
Loading Map
Loading Map
Overview
Opportunity ID
14001-0-2025
Version
1
Response Deadline
July 9, 2025
Past Due
Date Posted
April 3, 2025
Est. Value Range
Experimental
$5,000,000 - $20,000,000
(AI estimate)
Agency Distribution
High
Source
On 4/3/25 City of Madison - Engineering in Wisconsin issued Brayton Lot Development Project with ID 14001-0-2025 due 7/9/25.
Contacts
Documents
Posted documents for Brayton Lot Development Project
Opportunity Assistant
AI Analysis
AI Generate