Description
Background
The City of Madison Engineering Division is seeking consultant proposals for the 2026 Badger Mill Creek Watershed Study. This initiative is in response to damage from extreme rainfall events and aims to develop watershed models and plans for areas of concern in Madison.
The study will update existing models due to rapid development and changes in land use, land cover, and stormwater infrastructure since previous studies were conducted. The goal is to assess stormwater management systems against current performance targets and identify necessary improvements.
Work Details
The consultant will perform the following tasks:
1) Review existing watershed models and GIS data to identify areas needing updates due to new developments.
2) Update existing conditions models for Upper Badger Mill Creek (UBMC) and Lower Badger Mill Creek (LBMC) using PCSWMM software.
3) Execute updated models for various design events (1-, 2-, 5-, 10-, 25-, 100-, 200-, and 500-year storms).
4) Evaluate flood mitigation alternatives, including identifying causes of flooding and proposing solutions such as above-ground detention basins or additional inlets.
5) Conduct public engagement through virtual meetings to present findings and gather feedback.
6) Analyze pre-development hydrology conditions for LBMC to understand impacts on peak stormwater discharge.
Deliverables include technical memoranda, updated GIS shapefiles, flooding maps, a draft report summarizing findings, and final reports for both UBMC and LBMC watersheds.
Period of Performance
The anticipated project timeline spans approximately 17 months, starting from the RFP release on May 20, 2026, with a submission deadline of June 18, 2026.
Selection of consultants is expected by July 15, 2026, with project kickoff in mid-August 2026 and completion by December 2027.
Place of Performance
The work will be performed primarily within the Badger Mill Creek Watershed area in Madison, Wisconsin.
Bidder Requirements
Consultants must demonstrate experience with watershed modeling and stormwater management practices. They should also provide an Affirmative Action Plan if applicable, as well as strategies for ensuring Racial Equity and Social Justice throughout the project.
The City of Madison Engineering Division is seeking consultant proposals for the 2026 Badger Mill Creek Watershed Study. This initiative is in response to damage from extreme rainfall events and aims to develop watershed models and plans for areas of concern in Madison.
The study will update existing models due to rapid development and changes in land use, land cover, and stormwater infrastructure since previous studies were conducted. The goal is to assess stormwater management systems against current performance targets and identify necessary improvements.
Work Details
The consultant will perform the following tasks:
1) Review existing watershed models and GIS data to identify areas needing updates due to new developments.
2) Update existing conditions models for Upper Badger Mill Creek (UBMC) and Lower Badger Mill Creek (LBMC) using PCSWMM software.
3) Execute updated models for various design events (1-, 2-, 5-, 10-, 25-, 100-, 200-, and 500-year storms).
4) Evaluate flood mitigation alternatives, including identifying causes of flooding and proposing solutions such as above-ground detention basins or additional inlets.
5) Conduct public engagement through virtual meetings to present findings and gather feedback.
6) Analyze pre-development hydrology conditions for LBMC to understand impacts on peak stormwater discharge.
Deliverables include technical memoranda, updated GIS shapefiles, flooding maps, a draft report summarizing findings, and final reports for both UBMC and LBMC watersheds.
Period of Performance
The anticipated project timeline spans approximately 17 months, starting from the RFP release on May 20, 2026, with a submission deadline of June 18, 2026.
Selection of consultants is expected by July 15, 2026, with project kickoff in mid-August 2026 and completion by December 2027.
Place of Performance
The work will be performed primarily within the Badger Mill Creek Watershed area in Madison, Wisconsin.
Bidder Requirements
Consultants must demonstrate experience with watershed modeling and stormwater management practices. They should also provide an Affirmative Action Plan if applicable, as well as strategies for ensuring Racial Equity and Social Justice throughout the project.
Loading Map
Loading Map
Overview
Agency
Opportunity ID
15034-0-2026-BG
Response Deadline
June 18, 2026
Due in 2 Days
Date Posted
May 20, 2026
Source
Q&A Deadline
Questions regarding this project shall be directed to the City as described in the RFP document. Please submit any questions by email to the buyer as described in the RFP.
Est. Value Range
Experimental
$250,000 - $900,000
(AI estimate)
Agency Distribution
High
On 5/20/26
City of Madison
in Wisconsin issued 2026 Badger Mill Creek Watershed Study with ID 15034-0-2026-BG due 6/18/26.
Contacts
Documents
Posted documents for 2026 Badger Mill Creek Watershed Study
Opportunity Assistant
AI Analysis
AI Generate