Description
Background
The Lake Stevens Sewer District is issuing a solicitation for the construction of the Lift Station 11 Upgrade Project.
The project aims to enhance the sewer infrastructure, aligning with the district's mission to provide reliable wastewater services. The goal is to modernize existing facilities to ensure efficient operation and compliance with current standards.
Work Details
The project includes the following key tasks:
- Demolition and removal of the existing generator, fuel tank, and fuel lines.
- Full removal of the existing wet well along with existing pumps, associated piping, electrical systems, and appurtenances.
- Installation of an 8-foot diameter concrete wet well with new pumps, piping, and fittings.
- Construction of a concrete meter vault with an internal bypass connection.
- Installation of an owner-furnished generator on a concrete pad.
- Improvements to existing electrical instrumentation and control systems.
- Site grading and pavement.
Period of Performance
The project is expected to commence immediately after award and must be completed within the timeframe specified in the contract documents.
Place of Performance
The work will be performed at Lift Station 11 located within the jurisdiction of Lake Stevens Sewer District.
Bidder Requirements
Bidders must comply with all local regulations and requirements as specified in the solicitation documents. There are no specific M/WBE or SDVOSB set-asides mentioned.
The Lake Stevens Sewer District is issuing a solicitation for the construction of the Lift Station 11 Upgrade Project.
The project aims to enhance the sewer infrastructure, aligning with the district's mission to provide reliable wastewater services. The goal is to modernize existing facilities to ensure efficient operation and compliance with current standards.
Work Details
The project includes the following key tasks:
- Demolition and removal of the existing generator, fuel tank, and fuel lines.
- Full removal of the existing wet well along with existing pumps, associated piping, electrical systems, and appurtenances.
- Installation of an 8-foot diameter concrete wet well with new pumps, piping, and fittings.
- Construction of a concrete meter vault with an internal bypass connection.
- Installation of an owner-furnished generator on a concrete pad.
- Improvements to existing electrical instrumentation and control systems.
- Site grading and pavement.
Period of Performance
The project is expected to commence immediately after award and must be completed within the timeframe specified in the contract documents.
Place of Performance
The work will be performed at Lift Station 11 located within the jurisdiction of Lake Stevens Sewer District.
Bidder Requirements
Bidders must comply with all local regulations and requirements as specified in the solicitation documents. There are no specific M/WBE or SDVOSB set-asides mentioned.
Overview
Opportunity Type
RFB
Opportunity ID
20251202
Response Deadline
Jan. 6, 2026
Past Due
Date Posted
Dec. 3, 2025
Source
Est. Value Range
Experimental
$800,000 - $1,200,000
(AI estimate)
Agency Distribution
Moderate
On 12/3/25 Lake Stevens Sewer District in Washington issued RFB Lift Station 11 Upgrade Project with ID 20251202 due 1/6/26.
Contacts
Documents
Posted documents for Lift Station 11 Upgrade Project
Opportunity Assistant
AI Analysis
AI Generate