2026 Sewer Rehabilitation

ID: 211 • State: Washington
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

Background
The City of Bremerton is issuing a contract for the 2026 Sewer Rehabilitation project, aimed at rehabilitating sanitary and storm sewer pipes to improve infrastructure. The project includes cleaning and video inspection of sewer pipes to support future lining projects, aligning with the city's mission to maintain and enhance public utilities.

Work Details
The WORK includes rehabilitating sanitary and storm sewer pipes using cured-in-place pipe (CIPP) methods, along with cleaning and video inspection of these pipes. Specific tasks include:
- Video inspection and cleaning of approximately 12,335 linear feet of sanitary sewer pipe.
- Rehabilitation of approximately 5,462 linear feet of sanitary sewer pipe using heat-cured or ultra-violet (UV) CIPP methods, including reinstating side sewers and removing protruding laterals. Heat-cured CIPP methods must control styrene vapor emissions.
- Video inspection and cleaning of approximately 5,973 linear feet of storm sewer pipe.
- Rehabilitation of approximately 158 linear feet of storm sewer pipe using heat-cured or UV CIPP methods with similar emission controls as above.
- Additional work includes installing flow diversion, temporary bypass pumping, temporary traffic control, and other tasks as outlined in the Contract Documents. A portion of the work will be performed at night due to the project's location along a principal arterial.

Period of Performance
The WORK must be completed within 135 calendar days from the issuance date of the Notice to Proceed, which is anticipated around May 13, 2026.

Place of Performance
The contract work will be performed in Bremerton, Washington.

Bidder Requirements
Bidders must provide a bid proposal deposit equal to five percent (5%) of their bid amount. The successful bidder will need to furnish a Performance Bond for 100% of the Contract Price. Contractors are required to file a 'Statement of Intent to Pay Prevailing Wages' with the State of Washington Department of Labor & Industries before commencing work and comply with prevailing wage laws.
Loading Map
Loading Map

Overview

Opportunity ID
211
Response Deadline
March 25, 2026 Past Due
Date Posted
March 4, 2026
Source

Est. Value Range
Experimental
$1,500,000 - $3,000,000 (AI estimate)
Agency Distribution
Low
On 3/4/26 City of Bremerton in Washington issued 2026 Sewer Rehabilitation with ID 211 due 3/25/26.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for 2026 Sewer Rehabilitation

Opportunity Assistant


AI Analysis

AI Generate

Similar Active Opportunities