Description

Background
The Two-Rivers-Ottauquechee Regional Commission (TRORC) is seeking a general contractor for the Silver Lake State Park Stormwater Improvements project located in Barnard, Vermont. The project aims to enhance stormwater management, improve landscaping, and stabilize shorelines within the park. This initiative is part of TRORC's commitment to comply with the Vermont Department of Environmental Conservation requirements for funding.

Work Details
The contract involves construction activities across three main areas within Silver Lake State Park: the parking area, beach area, and gatehouse area. Specific improvements include:

1) **Parking Area Improvements**:
- Removal of a parking row replaced by a 2-cell gravel wetland and stormwater forebay.
- Construction of 4 stone plunge pools and 1 stone level spreader.
- Installation of catch basins, a new storm line, and a swale.
- Resurfacing and expansion of the existing parking lot with permeable pavers.
- Naturalization of the wetland buffer using native vegetation.

2) **Beach Area Improvements**:
- Construction of a small amphitheater with stone block seating and wheelchair access.
- Creation of a circular viewing platform overlooking the beach.
- Installation of ADA-compliant paths leading to the diving pad.
- Assembly of boulder jumbles and installation of curtain drains for drainage improvement.
- Replacement of failing retaining walls with stone block steps and implementation of encapsulated soil lifts for shoreline restoration.

3) **Gatehouse Area Improvements**:
- Construction/improvement of 2 roadside swales and 1 road culvert for stormwater management.
- Regrading and resurfacing the main intersection to improve vehicle access.
- Construction of a berm and bioretention area to enhance drainage.

Period of Performance
The construction window is set to begin after Labor Day on September 5, 2026, with substantial completion required by December 18, 2026, and final completion by May 29, 2027.

Place of Performance
All work will be performed at Silver Lake State Park located in Barnard, Vermont.

Bidder Requirements
Bidders must comply with specific requirements including:
- Submission of a bid bond or certified check not exceeding $25,000 along with their proposal.
- Provision of performance and payment bonds at contract award for 100% of the proposal value.
- A Certificate of Liability Insurance naming TRORC as certificate holder is required at bid submission.
- Compliance with Vermont's worker classification laws if bids exceed $250,000.
- Bidders must not be debarred from federal or state contracts.
Loading Map
Loading Map

Overview

Opportunity Type
Request for Quotation
Opportunity ID
73596
Version
1
Response Deadline
May 15, 2026 Due in 1 Days
Date Posted
April 10, 2026
Est. Value Range
Experimental
$500,000 - $1,500,000 (AI estimate)
Agency Distribution
High
Source
On 4/10/26 WATERSHED CONSULTING ASSOCIATES LLC in Vermont issued Request for Quotation Silver Lake State Park Stormwater Improvements with ID 73596 due 5/15/26.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Silver Lake State Park Stormwater Improvements

Opportunity Assistant


AI Analysis

AI Generate

Additional Details

Keywords
Construction (Non Building)
Locations
Windsor
Special Instructions
Plan requests shall be made by emailing Andres Torizzo, Owner Representative, at andres@watershedca.com with the subject line: Silver Lake State Park Stormwater Improvements