Background
The State of Vermont Military Department is issuing an Invitation to Bid for the construction of the Ethan Allen Firing Range Wildland Fire Apparatus Storage Building. This project aims to enhance the facilities at the Ethan Allen Firing Range located in Underhill, Vermont, by constructing a new storage building for wildland fire apparatus.
The project is part of the state's efforts to improve its infrastructure and support its mission in emergency response and fire management.
Work Details
The project consists of labor and materials for the construction of a 42 x 40 pre-engineered building along with site improvements as indicated on the drawings provided by Civil Engineering Associates, dated August 2024.
Specific tasks include site preparation, foundation work, structural assembly, roofing, electrical installations, and any necessary landscaping or drainage improvements as per the provided plans.
Period of Performance
The contract will be performed over a specified timeframe that will be detailed in the bid documents, with an expected completion date aligned with the project timeline established by Civil Engineering Associates.
Place of Performance
The construction will take place at the Ethan Allen Firing Range located at 77 Range Road, Underhill, Vermont.
Bidder Requirements
Bidders must comply with several requirements including:
- Full bonding for the job
- Carrying Builder’s Risk Insurance
- Compliance with Vermont Prevailing Wage and Fringe Benefit Rate requirements
- Adherence to domestic preference for procurements.
Additionally, contractors must undergo a criminal background check for all personnel working on-site and comply with security protocols set forth by VTARNG. Bidders are also required to disclose any potential conflicts of interest.
The State of Vermont Military Department is issuing an Invitation to Bid for the construction of the Ethan Allen Firing Range Wildland Fire Apparatus Storage Building. This project aims to enhance the facilities at the Ethan Allen Firing Range located in Underhill, Vermont, by constructing a new storage building for wildland fire apparatus.
The project is part of the state's efforts to improve its infrastructure and support its mission in emergency response and fire management.
Work Details
The project consists of labor and materials for the construction of a 42 x 40 pre-engineered building along with site improvements as indicated on the drawings provided by Civil Engineering Associates, dated August 2024.
Specific tasks include site preparation, foundation work, structural assembly, roofing, electrical installations, and any necessary landscaping or drainage improvements as per the provided plans.
Period of Performance
The contract will be performed over a specified timeframe that will be detailed in the bid documents, with an expected completion date aligned with the project timeline established by Civil Engineering Associates.
Place of Performance
The construction will take place at the Ethan Allen Firing Range located at 77 Range Road, Underhill, Vermont.
Bidder Requirements
Bidders must comply with several requirements including:
- Full bonding for the job
- Carrying Builder’s Risk Insurance
- Compliance with Vermont Prevailing Wage and Fringe Benefit Rate requirements
- Adherence to domestic preference for procurements.
Additionally, contractors must undergo a criminal background check for all personnel working on-site and comply with security protocols set forth by VTARNG. Bidders are also required to disclose any potential conflicts of interest.
Loading Map
Loading Map
Overview
Opportunity Type
Job Contract
Opportunity ID
73799
Response Deadline
July 15, 2026
Due in 43 Days
Date Posted
May 26, 2026
Source
Pre-Bid Conference
Mandatory pre-bid meeting at the site on 6/15/2026 at 10:00 AM (EST). Visitors must surrender a valid driver’s license.
Q&A Deadline
Questions must be submitted by email to the Project Manager, William Moore (William.moore@vermont.gov). Questions due by June 25, 2026 at 1:00 PM EST.
Est. Value Range
Experimental
$250,000 - $550,000
(AI estimate)
Agency Distribution
High
On 5/26/26 State of Vermont Military Department in Vermont issued Job Contract MIL DEPT - EAFR Wildland Fire Apparatus Building with ID 73799 due 7/15/26.
Contacts
Documents
Posted documents for MIL DEPT - EAFR Wildland Fire Apparatus Building
Opportunity Assistant
AI Analysis
AI Generate
Additional Details
Keywords
Architect and Engineering (Building), Building Materials and Supplies, Construction (Building), Electrical Equipment and Supplies, Engineering , HVAC, Plumbing and Heating, Painting Contractor, Well Drilling, Wire and Cable, Windows and Window Decor, Electrical Contractor, Insulation Contractor, Masonry, Concrete, General Contractor, Heating Equipment, Heating Installation and Services, Road Construction, Roofing Contractor, Sewage System Update, Storm Water System Design
Locations
Chittenden
Special Instructions
Contractors are invited to bid on the Ethan Allen Firing Range Wildland Fire Apparatus Storage Building at the Ethan Allen Firing Range in Underhill, Vermont. 77 Range Road Underhill, VT
Blueprints, Etc. is the official source of information for documents concerning this Invitation to Bid. Documents may be obtained from Blueprints, Etc., 20 Farrell Street, South Burlington, VT 05403, by phone at 802.865.4503, by fax at 802.865.0027 or email to: orders@blueprintsetc.com. Project Manuals and Plans are available for preview at:
http://www.blueprintsetc.com in the Private Plan Room. A password is required to access this project and may be obtained from Blueprints, Etc.. Any and all notifications, releases and addendums associated with this project will be posted at
http://www.blueprintsetc.com. There is a non-refundable fee for each set of documents purchased plus applicable shipping and tax.
Fee to Include one (1) Hard Copy $175.00 or one (1) Digital Copy: $125.00