Shore Drive Corridor Improvements, Phase 3
ID: LA86VABEACHCITY:79291 • State: Virginia
Opportunity Assistant
Loading
Description
Background
The City of Virginia Beach is issuing this Request for Proposal (RFP) for the Shore Drive Corridor Improvements, Phase 3 project. The mission of this project is to enhance vehicular and pedestrian traffic flow and safety between Lesner Bridge and Beech Street. The goal is to improve infrastructure in a way that supports the community's transportation needs while ensuring safety.
Work Details
The major elements of work include:
- Demolition
- Paving
- Drainage
- Water and sewer installation
- Traffic signalization
- Street lighting installation
- Storm water management systems
- Landscaping
Specific tasks involve the construction of 72-inch water quality structures with treatment capacity and flow rate requirements. Smaller structures may be permitted if they meet or exceed specified pollutant removals and treatment volumes as approved by the Virginia Department of Environmental Quality. Additionally, an Environmental Sensor Station (ESS) will be installed on the Lesner Bridge, which must include all sensors as per VDOT Road and Bridge Standards Section 806.
Period of Performance
The contract is expected to be awarded within a few months after receiving bids. The exact period of performance has not been specified but will align with the construction schedule following award.
Place of Performance
The work will take place along Shore Drive between Lesner Bridge and Beech Street in Virginia Beach, Virginia.
The City of Virginia Beach is issuing this Request for Proposal (RFP) for the Shore Drive Corridor Improvements, Phase 3 project. The mission of this project is to enhance vehicular and pedestrian traffic flow and safety between Lesner Bridge and Beech Street. The goal is to improve infrastructure in a way that supports the community's transportation needs while ensuring safety.
Work Details
The major elements of work include:
- Demolition
- Paving
- Drainage
- Water and sewer installation
- Traffic signalization
- Street lighting installation
- Storm water management systems
- Landscaping
Specific tasks involve the construction of 72-inch water quality structures with treatment capacity and flow rate requirements. Smaller structures may be permitted if they meet or exceed specified pollutant removals and treatment volumes as approved by the Virginia Department of Environmental Quality. Additionally, an Environmental Sensor Station (ESS) will be installed on the Lesner Bridge, which must include all sensors as per VDOT Road and Bridge Standards Section 806.
Period of Performance
The contract is expected to be awarded within a few months after receiving bids. The exact period of performance has not been specified but will align with the construction schedule following award.
Place of Performance
The work will take place along Shore Drive between Lesner Bridge and Beech Street in Virginia Beach, Virginia.
Overview
Agency
Opportunity Type
Invitation for Bids (IFB)
Opportunity ID
LA86VABEACHCITY:79291
Version
4
Response Deadline
Nov. 12, 2024
Past Due
Date Posted
Nov. 8, 2024
Last Updated
Nov. 8, 2024
Est. Value Range
Experimental
$15,000,000 - $25,000,000
(AI estimate)
Agency Distribution
High
Source
On 11/8/24 City of Virginia Beach in Virginia issued Invitation for Bids (IFB) Shore Drive Corridor Improvements, Phase 3 with ID LA86VABEACHCITY:79291 due 11/11/24.
Contacts
Documents
Posted documents for Shore Drive Corridor Improvements, Phase 3
Opportunity Assistant
AI Analysis
AI Generate
Classifications
Opportunity Classification
Construction
NAICS
Additional Details
Buyer Name
Francisco Barros
Full Source ID
IV79291