The Work consists of the construction of an approximately 180,000 sf three-story middle school and with associated sitework, co-located on the site of the existing Quioccasin Middle School, and the demolition of the existing Quioccasin Middle School. The new middle school building consists of a structural system with a combination of loadbearing CMU and steel framing. Interior partitions include CMU, drywall and limited amounts of wood veneer paneling. Flooring includes polished concrete, carpet tiles, wood sports and stage flooring and rubber floor tile. Roofing systems include EPDM membrane. Building features include kitchen with food service equipment, dining commons, a main gymnasium, an auxiliary gymnasium, 500-seat auditorium, library, general classrooms, career technical and technology areas, Innovation Center areas and classrooms, Family and Community Engagement office area and administration areas. The building has been designed to achieve LEED Silver certification and will require coordination with LEED requirements. Site construction includes the construction of a new bus loop, bus canopy and new parking area including all grading, erosion and sediment control, stormwater management, site utilities, driveways, paving and sidewalks, fencing, site lighting, signage and landscaping. Demolition of the existing school may require hazardous material abatement. A hazardous materials study has been provided by the owner and is included as a part of the bid documents. New athletic facilities include a new baseball field, softball field, tennis courts, and multipurpose field. Sports lighting is included for the athletic fields. The project consists of two general phases: Phase 1 consists of the construction of the new middle school, bus loop and canopy and partial site work and parking areas as indicated in the Contract Documents. The existing middle school will be occupied and remain in operation during the entire period of construction; Phase 2 consists of the demolition of the existing middle school and associated sitework, the construction of the new Baseball field, softball field, tennis courts, multipurpose field and the balance of sitework and parking. The new middle school will be occupied and remain in operation during the entire period of this phase. Project is located at 9400 Quioccasin Road, Henrico VA, 23238.
Background
The Commonwealth of Virginia, specifically the County of Henrico, is issuing this Invitation to Bid for the replacement of Quioccasin Middle School. The project aims to construct a new middle school facility that aligns with the educational needs of Henrico County Public Schools while ensuring minimal disruption during construction.
Work Details
The work includes the construction of an approximately 180,000 square foot three-story middle school and associated sitework on the existing Quioccasin Middle School site, along with the demolition of the current building. The new school will feature a structural system combining loadbearing CMU and steel framing, with interior partitions made of CMU, drywall, and limited wood veneer paneling. Flooring types include polished concrete, carpet tiles, wood sports and stage flooring, and rubber floor tile. The roofing system will consist of EPDM membrane. Key building features include:
- Kitchen with food service equipment
- Dining commons
- Main gymnasium
- Auxiliary gymnasium
- 500-seat auditorium
- Library
- General classrooms
- Career technical and technology areas
- Innovation Center areas and classrooms
- Family and Community Engagement office area
- Administration areas.
The building is designed to achieve LEED Silver certification, requiring coordination with LEED standards. Site construction involves creating a new bus loop, bus canopy, parking area, grading, erosion control, stormwater management, site utilities, driveways, paving, sidewalks, fencing, site lighting, signage, and landscaping. Demolition may require hazardous material abatement as indicated in a provided hazardous materials study. New athletic facilities will include a baseball field, softball field, tennis courts, and a multipurpose field with sports lighting included. The project is divided into two phases: Phase 1 involves constructing the new middle school while keeping the existing school operational; Phase 2 includes demolishing the existing school and completing remaining sitework.
Period of Performance
The contract work is expected to commence upon award and will proceed through both phases as outlined in the contract documents.
Place of Performance
The project will be performed at 9400 Quioccasin Road, Henrico VA 23238.
Bidder Requirements
Bidders must comply with all conditions specified in the bid documents. A non-mandatory pre-bid conference is scheduled for August 6, 2025. Bids must be submitted electronically via Henrico County’s Electronic Documents Web Portal.