Salt Lake City Airport SkyChef Building Demolition
ID: SLCDA-DCM-542611
• State: Utah
Opportunity Assistant
Loading
Description
Background
The Salt Lake City International Airport is issuing a contract for the demolition of the SkyChef Building, located between 3700 West and the Delta Cargo facility. The goal of this contract is to safely demolish the existing building and parking area while ensuring compliance with safety regulations. Additionally, the project aims to enhance airport security through the installation of SIDA fencing.
Work Details
The contractor will be responsible for the following tasks:
1. Demolition of the existing SkyChef building and associated parking area.
2. Installation of SIDA fencing to complete the SIDA perimeter around the demolition site.
3. Covering the demolition area with asphalt millings to ensure a safe and stable surface post-demolition.
Period of Performance
The contract work is expected to commence upon award and must be completed within a specified timeframe as outlined in the contract documents. Bids are due on January 29, 2026.
Place of Performance
The work will be performed at Salt Lake City International Airport, specifically at the site of the SkyChef Building located between 3700 West and the Delta Cargo facility.
Bidder Requirements
Bidders must be properly licensed to perform construction work in Utah and comply with all local laws and regulations. A bid security in the form of a bid bond or cashier's check equal to at least five percent (5%) of the total bid amount is required. Bidders must also submit a Subcontractor and Supplier Report within 24 hours of request by the Owner.
The Salt Lake City International Airport is issuing a contract for the demolition of the SkyChef Building, located between 3700 West and the Delta Cargo facility. The goal of this contract is to safely demolish the existing building and parking area while ensuring compliance with safety regulations. Additionally, the project aims to enhance airport security through the installation of SIDA fencing.
Work Details
The contractor will be responsible for the following tasks:
1. Demolition of the existing SkyChef building and associated parking area.
2. Installation of SIDA fencing to complete the SIDA perimeter around the demolition site.
3. Covering the demolition area with asphalt millings to ensure a safe and stable surface post-demolition.
Period of Performance
The contract work is expected to commence upon award and must be completed within a specified timeframe as outlined in the contract documents. Bids are due on January 29, 2026.
Place of Performance
The work will be performed at Salt Lake City International Airport, specifically at the site of the SkyChef Building located between 3700 West and the Delta Cargo facility.
Bidder Requirements
Bidders must be properly licensed to perform construction work in Utah and comply with all local laws and regulations. A bid security in the form of a bid bond or cashier's check equal to at least five percent (5%) of the total bid amount is required. Bidders must also submit a Subcontractor and Supplier Report within 24 hours of request by the Owner.
Loading Map
Loading Map
Overview
Agency
Opportunity Type
IFB
Opportunity ID
SLCDA-DCM-542611
Response Deadline
Feb. 19, 2026
Past Due
Date Posted
Dec. 23, 2025
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.
Est. Value Range
Experimental
$500,000 - $1,500,000
(AI estimate)
Agency Distribution
High
On 12/23/25 CITIES - Salt Lake City Corporation in Utah issued IFB Salt Lake City Airport SkyChef Building Demolition with ID SLCDA-DCM-542611 due 2/19/26.
Contacts
Documents
Posted documents for Salt Lake City Airport SkyChef Building Demolition
Opportunity Assistant
AI Analysis
AI Generate
Classifications
Additional Details
Questions Due
02/13/2026