RFP - Summit County SR-32 Trail Design
ID: SUCO202528907
• State: Utah
Opportunity Assistant
Loading
Description
Background
The Summit County government is seeking design services for an asphalt trail project alongside SR-32. This initiative aims to enhance transportation and recreational opportunities in the region, connecting the communities of Marion, Kamas, and Francis. The project encompasses a total distance of approximately three miles, with the goal of providing a safe and accessible trail for pedestrians and cyclists.
Work Details
The contractor will provide comprehensive design services for the asphalt trail, which includes:
1. Developing a full design package that covers vertical and horizontal alignment, signage, striping, storm drainage, sidewalks, existing utilities, utility conflicts with suggested remedies, culvert extensions, earthwork, typical sections, and driveway tie-ins.
2. Designing a bridge to cross over a creek.
3. Redesigning an irrigation diversion structure.
4. Producing a complete set of design plans, specifications, and an engineer’s estimate that comply with current UDOT standards.
Period of Performance
The contract is expected to commence following the award on January 13, 2025, with specific timelines for each phase of the design work to be determined during the project planning.
Place of Performance
The work will be performed in Summit County along SR-32 from Marion to Kamas (1500 North-300 North) and from Kamas to Francis (530 South-SR-35).
The Summit County government is seeking design services for an asphalt trail project alongside SR-32. This initiative aims to enhance transportation and recreational opportunities in the region, connecting the communities of Marion, Kamas, and Francis. The project encompasses a total distance of approximately three miles, with the goal of providing a safe and accessible trail for pedestrians and cyclists.
Work Details
The contractor will provide comprehensive design services for the asphalt trail, which includes:
1. Developing a full design package that covers vertical and horizontal alignment, signage, striping, storm drainage, sidewalks, existing utilities, utility conflicts with suggested remedies, culvert extensions, earthwork, typical sections, and driveway tie-ins.
2. Designing a bridge to cross over a creek.
3. Redesigning an irrigation diversion structure.
4. Producing a complete set of design plans, specifications, and an engineer’s estimate that comply with current UDOT standards.
Period of Performance
The contract is expected to commence following the award on January 13, 2025, with specific timelines for each phase of the design work to be determined during the project planning.
Place of Performance
The work will be performed in Summit County along SR-32 from Marion to Kamas (1500 North-300 North) and from Kamas to Francis (530 South-SR-35).
Overview
Agency
Opportunity Type
RFP
Opportunity ID
SUCO202528907
Response Deadline
Jan. 13, 2025
Past Due
Date Posted
Dec. 9, 2024
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.
Est. Value Range
Experimental
$500,000 - $1,500,000
(AI estimate)
Agency Distribution
High
On 12/9/24 Utah in Utah issued RFP Summit County SR-32 Trail Design with ID SUCO202528907 due 1/13/25.
Contacts
Documents
Posted documents for RFP - Summit County SR-32 Trail Design
Opportunity Assistant
AI Analysis
AI Generate