Project will consist of reshaping over a mile of storm drain ditch and replacing 10 concrete structures along the storm drain ditch.
Background
The Pleasant Grove Storm Drain Outfall Project is a construction project issued by the DFCM Division Facilities and Construction and Management. The project aims to reshape over a mile of storm drain ditch, replace 10 concrete structures, and loop utilities along the storm drain ditch.

Work Details
The project will consist of reshaping over a mile of storm drain ditch and replacing 10 concrete structures along the storm drain ditch. Sheet piles will need to be installed for about 1600 feet along the ditch.

The construction services required include:
- Sewer maintenance and repair
- Roads and highways construction
- Excavation and backfill services
- Levee and dam construction
- Digging and ditching
- Road grading
- Rock stabilization
- Equipment rental or lease
- Energy conservation
- Heavy construction machinery and equipment including equipment for paving and earth moving
- Concrete, cement, plaster, lime, mortars, metal, roads and landscape material including asphalts and road and railroad construction materials
- Soil stabilizers
- Artificial turf
- Construction aggregates including rock, gravel, and sand.
Additionally, specialized trade construction and maintenance services such as elevator installation and maintenance services are needed.

Period of Performance
The project is open for bidding from February 23rd, 2024 at 9:00 AM MST to March 13th, 2024 at 2:00 PM MDT.

Overview

Opportunity Type
IFB
Opportunity ID
PG202425775
Version
1
Response Deadline
March 26, 2024 Past Due
Date Posted
Feb. 23, 2024
Agency Distribution
High
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.
On 2/23/24 Utah in Utah issued IFB Pleasant Grove Storm Drain Outfall Project with ID PG202425775 due 3/26/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Pleasant Grove Storm Drain Outfall Project

Similar Active Opportunities