Search Contract Opportunities

Pleasant Grove NATHANIEL DRIVE WATERLINE AND ROADWAY IMPROVEMENTS PROJECT

ID: PG202425920 • State: Utah
Get Real Time Alerts from 40k+ Federal, State and Local Agencies
Find Now

Description

This project will inlclude about 5570 linear feet of C-900 water line instalation, about 3,150 ft of pavement section replacement, fire hydrants, and service line replacements.
Background
The Pleasant Grove NATHANIEL DRIVE WATERLINE AND ROADWAY IMPROVEMENTS PROJECT involves the installation of approximately 5570 linear feet of C-900 water line, about 3,150 ft of pavement section replacement, fire hydrants, and service line replacements. The project falls under the commodity codes for construction services including sewer maintenance and repair, roads and highways, excavation and backfill services, levee and dam construction, digging, ditching, road grading, rock stabilization, equipment rental or lease, and energy conservation.
The project is managed by the DFCM Division Facilities and Construction Management.

Work Details
The work includes the installation of approximately 5570 linear feet of C-900 water line with fittings at an average bury depth of 4 feet to top of the pipe, including valves, fittings, water services, irrigation services, fire hydrants, and sampling station. It also involves the removal and rehabilitation of approximately 12,100 square yards of roadway asphalt and road base. Additionally, it includes the removal and disposal of an existing Pressure Reducing Vault (PRV).
Furthermore, the project encompasses approximately 2,420 feet of 8” PVC C900 water main and fittings at an average bury depth of 4 feet to top of the pipe on the west side of Murdock Canal Trail. This includes valves, fittings, water services, irrigation services, fire hydrants, and sampling station as well as cutting and patching asphalt for approximately 1,422 square yards of roadway asphalt and road base.

Place of Performance
The project's place of performance is in Pleasant Grove.

Overview

Opportunity Type
IFB
Opportunity ID
PG202425920
Response Deadline
April 2, 2024 Past Due
Date Posted
March 6, 2024
Agency Distribution
High
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.
On 3/6/24 Utah in Utah issued IFB Pleasant Grove NATHANIEL DRIVE WATERLINE AND ROADWAY IMPROVEMENTS PROJECT with ID PG202425920 due 4/2/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Pleasant Grove NATHANIEL DRIVE WATERLINE AND ROADWAY IMPROVEMENTS PROJECT

Similar Active Opportunities