Highland Drive & 14600 South Intersection Improvements

ID: CIP 26-08 • State: Utah
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

Background
The Highland Drive & 14600 South Intersection Improvements project is initiated by Draper City Corporation's Engineering Division. The project aims to enhance roadway safety and efficiency by removing existing roadway improvements, widening the road, and implementing necessary drainage improvements. The goal is to improve traffic flow at the intersection of Minuteman Drive and 14600 South/Highland Drive as outlined in the project plans and specifications.

Work Details
The contractor will provide all labor, materials, tools, and equipment necessary for the following tasks:
- Remove existing roadway improvements and widen the roadway with curb and gutter.
- Perform asphalt and drainage improvements on Minuteman Drive.
- Resurface the intersection of Minuteman Drive and 14600 South/Highland Drive according to project specifications.

Specific items include:
1. Storm Water Pollution Prevention Plan (SWPPP)
2. Traffic Control System
3. Clearing and Grubbing
4. Roadway Asphalt Removal (3" Depth Assumed) - 7365 SF
5. Roadway Asphalt Removal (6" Depth Assumed) - 1870 SF
6. Concrete Flatwork Removal - 745 SF
7. Curb and Gutter Removal - 595 LF
8. Concrete Median Removal - 17 LF
9. Roadway Excavation - 752 CY
10. Remove Concrete Drainage Structure Lid - 1 Ea
11. Modify Existing Cleanout Box - 1 Ea
12. Catch Basins (4'x4' & 3'x3') - 2 Ea each
13. Reinforced Concrete Pipe (15") - 488 LF
14. Concrete Sidewalk - 715 SF
15. Cast Iron Detectable Warning Plates (24"x48") - 2 Ea
16. Concrete Curb & Gutter - 1063 LF
17. Plowable End Section - 1 Ea
18. Granular Borrow - 347 CY
19. Untreated Base Course - 232 CY
20. Highly Modified Hot Mix Asphalt (PG76-34) - 503 Ton
21. Manhole to Finish Grade - 1 Ea
22. Water Valve to Finish Grade - 1 Ea
23. Micro-Surface Seal - 105500 SF
24. Street Sign Relocations - 3 Ea
25. Flexible Object Marker - 1 Ea
26. Pavement Striping and Marking.

Period of Performance
The work is scheduled to commence no later than July 13th, 2026, with a substantial completion date set for September 26th, 2026.

Place of Performance
The contract work will be performed at the intersection of Highland Drive and 14600 South in Draper, Utah.

Bidder Requirements
Bidders must submit a bid bond of five percent of the total bid amount along with their proposal, which will be returned upon execution of the contract if awarded to them. A performance bond equal to one hundred percent of the contract price will also be required upon award.
Loading Map
Loading Map

Overview

Opportunity Type
IFB
Opportunity ID
CIP 26-08
Response Deadline
June 12, 2026 Past Due
Date Posted
May 26, 2026
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.

Q&A Deadline
Questions concerning the scope of work, response submittal, or process should be directed electronically through U3P (PURCHASING.UTAH.GOV). Questions are due before 5:00 PM on Thursday, June 11, 2026.
Est. Value Range
Experimental
$1,800,000 - $4,200,000 (AI estimate)
Agency Distribution
High
On 5/26/26 CITIES - Draper City in Utah issued IFB Highland Drive & 14600 South Intersection Improvements with ID CIP 26-08 due 6/12/26.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Highland Drive & 14600 South Intersection Improvements

Opportunity Assistant


AI Analysis

AI Generate

Additional Details

Questions Due
06/11/2026

Similar Active Opportunities