Search Contract Opportunities

EMC WWTF Wastewater Expansion Oxidation Ditch Upgrades GMP 2

ID: EMC-DY26-15 • Alt ID: EMC-FY26-15 • State: Utah
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

Background
Eagle Mountain City is issuing a Request for Proposal (RFP) for the EMWWTF Wastewater Expansion Oxidation Ditch Upgrades project, which is part of a larger 6.0 MGD MBR Wastewater Expansion project. MGC, Inc. has been selected as the Construction Manager/General Contractor for this project. The goal of the contract is to improve the existing oxidation ditch's rated capacity to 2.0 million gallons per day (MGD) average daily flow, addressing current loading issues and optimizing treatment processes.

Work Details
The scope of services includes construction of an MBR facility and upgrades to the oxidation ditch to achieve a total average daily flow design capacity of 8.0 MGD. Specific tasks include:
- Early work package consisting of pumping and piping for process intensification in the existing oxidation ditch.
- Preconstruction services including design review, guaranteed maximum price (GMP) development, and procurement services for qualified subcontractors and equipment.
- The construction duration is expected to be 9 months, starting in July 2026.

Period of Performance
The expected start date for construction is July 2026, with a total duration of 9 months.

Place of Performance
The project will be located at the Eagle Mountain Wastewater Treatment Facility (WWTF), specifically at 2515 N Pony Express Blvd, Eagle Mountain, UT 84005.

Bidder Requirements
Bidders must provide a bid bond of 5% of the total project cost with their proposal. Successful bidders are required to submit a 100% performance bond and a 100% payment bond upon contract signing. Additionally, bidders must be prequalified with Eagle Mountain City prior to submitting proposals.
Loading Map
Loading Map

Overview

Opportunity Type
RFP
Opportunity ID
EMC-DY26-15
Response Deadline
May 26, 2026 Past Due
Date Posted
May 7, 2026
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.

Est. Value Range
Experimental
$8,000,000 - $18,000,000 (AI estimate)
Agency Distribution
High
On 5/7/26 CITIES - Eagle Mountain City in Utah issued RFP EMC WWTF Wastewater Expansion Oxidation Ditch Upgrades GMP 2 with ID EMC-DY26-15 due 5/26/26.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for EMC WWTF Wastewater Expansion Oxidation Ditch Upgrades GMP 2

Opportunity Assistant


AI Analysis

AI Generate

Additional Details

Questions Due
05/20/2026

Similar Active Opportunities