Search Contract Opportunities

EMC 4.8 MGD WWTF Expansion

ID: EMC-FY25-04 • State: Utah
Get Real Time Alerts from 40k+ Federal, State and Local Agencies
Find Now

Description

Evaluate WWTF facility for expansion, evaluate onsite electrical capacity and design, provide detailed design & drawings
Background
Eagle Mountain is requesting proposals for the expansion of the city's wastewater treatment facility (WWTF). The facility currently treats wastewater from the south service area using an activated sludge process and has undergone previous expansions to increase its capacity.

The city aims to design a tertiary treatment facility to enhance wastewater treatment standards, ultimately allowing for the use of treated wastewater as a pressurized irrigation source.

Work Details
The contractor will evaluate possible treatment methods for the expansion of the WWTF and provide a detailed design for electrical upgrades. This includes creating design drawings to accommodate an additional capacity of 2.4 million gallons per day (MGD).

Additionally, the contractor will assess the available onsite electrical capacity and design necessary upgrades to support the expanded capacity.

Period of Performance
The contract work is expected to commence upon award and will be performed until project completion. Proposals are due by September 26, 2024.

Place of Performance
The work will be performed at the existing wastewater treatment facility located south of the city offices in Eagle Mountain.

Overview

Opportunity Type
RFP
Opportunity ID
EMC-FY25-04
Response Deadline
Sept. 26, 2024 Past Due
Date Posted
Sept. 5, 2024
Est. Value Range
Experimental
$5,000,000 - $15,000,000 (AI estimate)
Agency Distribution
High
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.
On 9/5/24 Utah in Utah issued RFP EMC 4.8 MGD WWTF Expansion with ID EMC-FY25-04 due 9/26/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for EMC 4.8 MGD WWTF Expansion

Similar Active Opportunities