Search Contract Opportunities

DFCM Construction - DNR-Utah State Parks Snow Canyon State Park Paving & Entrance Station - 23497510

ID: MP25009 • State: Utah

Description

DFCM Construction - DNR-Utah State Parks Snow Canyon State Park Paving & Entrance Station - 23497510 - STANDARD LOW BID
Background
The State of Utah - Division of Facilities Construction and Management (DFCM) is issuing this solicitation for the construction project at Snow Canyon State Park. The project aims to enhance the park's facilities by replacing the existing entrance station and improving parking areas, aligning with the agency's mission to maintain and improve state parks for public enjoyment.

Work Details
The project includes the following tasks: removal of the existing entrance station, construction of a new entrance station building, and various parking improvements throughout Snow Canyon State Park.

Specific work items include:
- Mobilization/demobilization
- Field surveying and staking
- Traffic control
- Installation of 3” thick asphalt pavement over an 8” thick untreated base course
- Construction of gravel parking lots
- Curb and gutter installation
- Concrete curb for the entrance station
- Mountable curb and gutter
- Concrete parking blocks
- Pavement striping
- Bollards
- Signage
- Silt tortoise fence installation
- Drainage ditch construction
- Pressure treated wood stairs
- Earthwork including geo-cell fabric installation, topsoil placement, and reseeding.

Additional tasks include:
- Riprap stabilization with geotextile fabric
- Raising the entrance station and water valve can
- Installing a rail wood signature fence and retaining block wall
- Constructing a speed hump
- Installing an 18" CMP culvert with end sections and concrete pipe collar
- Raising manhole covers
- Stabilizing the entrance station with riprap and geotextile fabric
- Excavating soft spots and re-compacting with imported fill material
- Constructing a welded steel fence
- Removing catch basins
- Constructing a concrete island.
- Demolishing the existing entrance station.

Period of Performance
The contract work is expected to commence after the bid opening on August 22, 2024. The specific duration of performance will be determined post-award.

Place of Performance
The work will be performed at Snow Canyon State Park located in Ivins, Utah.

Overview

Opportunity Type
IFB
Opportunity ID
MP25009
Response Deadline
Aug. 22, 2024 Past Due
Date Posted
Aug. 2, 2024
Est. Value Range
Experimental
$500,000 - $1,500,000 (AI estimate)
Agency Distribution
High
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.
On 8/2/24 Utah State Parks in Utah issued IFB DFCM Construction - DNR-Utah State Parks Snow Canyon State Park Paving & Entrance Station - 23497510 with ID MP25009 due 8/22/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for DFCM Construction - DNR-Utah State Parks Snow Canyon State Park Paving & Entrance Station - 23497510

Similar Active Opportunities