Consulting Services For Central 138 Kv Substation
ID: 25-52
• State: Utah
Opportunity Assistant
Loading
Description
Background
Murray City Power, established in 1913, is a municipal utility that provides reliable and affordable electricity to its residents. The utility serves approximately 18,000 customers with a diverse energy mix and a mission to modernize substation infrastructure and improve system reliability.
The purpose of this RFP is to solicit competitive sealed proposals from qualified engineering firms for the design and consultation services needed for the construction of the Central 138 kV Substation located south of 153 West 4800 South, Murray, Utah.
Work Details
The selected engineering firm will provide full engineering design and consultation services for the Central 138 kV Substation. This includes:
- Conceptual and detailed civil and electrical design
- Equipment and construction specifications
- Construction assistance and optional testing and commissioning
- Record drawings, documentation, and training.
Specific tasks include:
1. Project Kick-off and Preliminary Design (35 hours)
2. Detailed Substation Civil Engineering (150 hours)
- Create general arrangement and site plan
- Provide specifications for site survey and geotechnical report
- Perform detailed steel design including various supports
3. Detailed Substation Electrical Design Engineering (100 hours)
- Create one-line diagrams, three-line diagrams, electrical schematics
4. Specifications for Substation Equipment (75 hours)
5. Construction Assistance (40 hours)
6. Testing and Commissioning Assistance (200 hours optional)
7. Completion and Training (40 hours).
Deliverables include various drawings such as site plans, general arrangement plans, grounding plans, etc.
Period of Performance
The contract work is expected to commence upon award in December 2025, with specific deliverables scheduled throughout the project timeline leading up to a bid release date of February 1, 2026.
Place of Performance
The contract will be performed at the Central 138 kV Substation site located south of 153 West 4800 South, Murray, Utah.
Bidder Requirements
Bidders must demonstrate relevant experience in substation or engineering consulting work. They are required to provide proof of insurance coverage including General Liability ($1 million per occurrence), Professional Liability ($1 million), Workers’ Compensation Insurance as per statutory limits, and Automobile Liability ($1 million).
Additionally, bidders should provide financial capability evidence, references from similar projects within the past five years, and comply with all applicable federal, state, and local laws.
Murray City Power, established in 1913, is a municipal utility that provides reliable and affordable electricity to its residents. The utility serves approximately 18,000 customers with a diverse energy mix and a mission to modernize substation infrastructure and improve system reliability.
The purpose of this RFP is to solicit competitive sealed proposals from qualified engineering firms for the design and consultation services needed for the construction of the Central 138 kV Substation located south of 153 West 4800 South, Murray, Utah.
Work Details
The selected engineering firm will provide full engineering design and consultation services for the Central 138 kV Substation. This includes:
- Conceptual and detailed civil and electrical design
- Equipment and construction specifications
- Construction assistance and optional testing and commissioning
- Record drawings, documentation, and training.
Specific tasks include:
1. Project Kick-off and Preliminary Design (35 hours)
2. Detailed Substation Civil Engineering (150 hours)
- Create general arrangement and site plan
- Provide specifications for site survey and geotechnical report
- Perform detailed steel design including various supports
3. Detailed Substation Electrical Design Engineering (100 hours)
- Create one-line diagrams, three-line diagrams, electrical schematics
4. Specifications for Substation Equipment (75 hours)
5. Construction Assistance (40 hours)
6. Testing and Commissioning Assistance (200 hours optional)
7. Completion and Training (40 hours).
Deliverables include various drawings such as site plans, general arrangement plans, grounding plans, etc.
Period of Performance
The contract work is expected to commence upon award in December 2025, with specific deliverables scheduled throughout the project timeline leading up to a bid release date of February 1, 2026.
Place of Performance
The contract will be performed at the Central 138 kV Substation site located south of 153 West 4800 South, Murray, Utah.
Bidder Requirements
Bidders must demonstrate relevant experience in substation or engineering consulting work. They are required to provide proof of insurance coverage including General Liability ($1 million per occurrence), Professional Liability ($1 million), Workers’ Compensation Insurance as per statutory limits, and Automobile Liability ($1 million).
Additionally, bidders should provide financial capability evidence, references from similar projects within the past five years, and comply with all applicable federal, state, and local laws.
Loading Map
Loading Map
Overview
Agency
Opportunity Type
RFP
Opportunity ID
25-52
Response Deadline
Nov. 18, 2025
Past Due
Date Posted
Nov. 7, 2025
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.
Est. Value Range
Experimental
$500,000 - $2,000,000
(AI estimate)
Agency Distribution
High
On 11/7/25 CITIES - Murray City in Utah issued RFP Consulting Services For Central 138 Kv Substation with ID 25-52 due 11/18/25.