2026 Overlay Project
ID: WJPW26052601
• State: Utah
Opportunity Assistant
Loading
Description
Background
The 2026 West Jordan Roadway Overlay Project is initiated by the city of West Jordan, aimed at improving the infrastructure of key collector streets. The project focuses on enhancing road safety and accessibility for the community, aligning with the city's mission to maintain and upgrade public roadways.
Work Details
The work includes the overlay of up to five collector streets: 5600 West, 7800 South, Prosperity Road, Old Bingham Highway, and Gardner Lane. Specific tasks involve:
- Milling and overlaying portions of these streets;
- Lowering and raising utility manholes, valves, and monuments;
- Replacing ADA ramps;
- Repairing or replacing curb and sidewalk;
- Installing traffic markings and striping according to provided plans.
Notably, work on Old Bingham Highway and Gardner Lane must occur after school ends in June and be completed before school begins in August. The contractor is responsible for obtaining all necessary permits to perform the work, adhering to UTA and UDOT requirements.
Period of Performance
The contract performance period is expected to commence after school ends in June 2026 and must be completed before school starts in August 2026.
Place of Performance
The geographic locations for the contract performance are the specified collector streets within West Jordan, Utah.
Bidder Requirements
Contractors must provide a Certificate of Insurance (COI) that includes general liability limits matching contract coverage as verified via AM Best. Additional insured endorsements are required for ongoing operations. Contractors must ensure compliance with all insurance requirements throughout the project duration.
The 2026 West Jordan Roadway Overlay Project is initiated by the city of West Jordan, aimed at improving the infrastructure of key collector streets. The project focuses on enhancing road safety and accessibility for the community, aligning with the city's mission to maintain and upgrade public roadways.
Work Details
The work includes the overlay of up to five collector streets: 5600 West, 7800 South, Prosperity Road, Old Bingham Highway, and Gardner Lane. Specific tasks involve:
- Milling and overlaying portions of these streets;
- Lowering and raising utility manholes, valves, and monuments;
- Replacing ADA ramps;
- Repairing or replacing curb and sidewalk;
- Installing traffic markings and striping according to provided plans.
Notably, work on Old Bingham Highway and Gardner Lane must occur after school ends in June and be completed before school begins in August. The contractor is responsible for obtaining all necessary permits to perform the work, adhering to UTA and UDOT requirements.
Period of Performance
The contract performance period is expected to commence after school ends in June 2026 and must be completed before school starts in August 2026.
Place of Performance
The geographic locations for the contract performance are the specified collector streets within West Jordan, Utah.
Bidder Requirements
Contractors must provide a Certificate of Insurance (COI) that includes general liability limits matching contract coverage as verified via AM Best. Additional insured endorsements are required for ongoing operations. Contractors must ensure compliance with all insurance requirements throughout the project duration.
Loading Map
Loading Map
Overview
Agency
Opportunity Type
IFB
Opportunity ID
WJPW26052601
Response Deadline
June 16, 2026
Due in 17 Days
Date Posted
May 26, 2026
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.
Q&A Deadline
Questions due by 06/10/2026.
Est. Value Range
Experimental
$2,500,000 - $8,500,000
(AI estimate)
Agency Distribution
High
On 5/26/26 CITIES - City of West Jordan in Utah issued IFB 2026 Overlay Project with ID WJPW26052601 due 6/16/26.
Contacts
Documents
Posted documents for 2026 Overlay Project
Opportunity Assistant
AI Analysis
AI Generate
Classifications
Additional Details
Questions Due
06/10/2026