The Falls Renovation Construction Manager at Risk (CMaR)

ID: RFP 03-26 • State: Texas
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading
Real Time Alerts from 50k+ Federal, State and Local Agencies
Find Now

Description

Background
The City of Wichita Falls, Texas is seeking to select a Construction Manager-at-Risk (CMAR) contractor for the final design and construction of The Falls Rehabilitation project. This project aims to enhance the functionality and aesthetics of The Falls, which includes a manmade waterfall, landscaping, and adjacent trails. The CMAR will provide preconstruction services, procurement services, and oversee construction activities to ensure efficiency and cost-effectiveness.

Work Details
The scope of work includes:

1) Demolition of rock veneer and selective removal of dry-stack rock;
2) Replacement of metal intake well and screen;
3) Replacement of a 3,600 gpm, 100-HP main pump along with associated piping, valves, and controls;
4) Installation of a 3,600 gpm, 50-HP recirculation pump with piping, valves, and controls;
5) Replacement of two pump manhole lids with fixed concrete tops that include access hatches and safety screens;
6) Widening approximately 1,050 linear feet of concrete trail;
7) Construction of a new retaining wall (140 LF x 10 ft high) with rock veneer;
8) Landscaping and irrigation improvements;
9) Replacement of area lighting with LED fixtures;
10) Installation of new programmable LED flood lighting (three pole-mounted Lumascape Kokolux or equivalent);
11) Replacement of the existing electrical building with a new structure approximately 100 square feet in size;
12) Installation of a new main disconnect rated at 480V and 400A; and
13) Installation of a new PLC control panel featuring a Schneider Modicon PLC TM251MESE.

Period of Performance
The CMAR Construction Phase is expected to start in March 2027 with a duration of approximately 270 calendar days. The Demolition Package is anticipated to begin in July 2026.

Place of Performance
The work will be performed at The Falls located on the south bank of the Wichita River in Wichita Falls, Texas.

Bidder Requirements
Proposers must demonstrate relevant CMAR experience or alternative delivery project management experience. They are required to submit financial statements indicating their capacity to undertake the project. Additionally, they must complete a Conflict of Interest Questionnaire as part of their proposal submission.
Loading Map
Loading Map

Overview

Opportunity ID
RFP 03-26
Response Deadline
May 19, 2026 Past Due
Date Posted
April 19, 2026
Source

Pre-Bid Conference
05/04/26 @ 10AM in Room 1D32
Est. Value Range
Experimental
$5,000,000 - $10,000,000 (AI estimate)
Agency Distribution
Low
On 4/19/26 Wichita Falls in Texas issued The Falls Renovation Construction Manager at Risk (CMaR) with ID RFP 03-26 due 5/19/26.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for The Falls Renovation Construction Manager at Risk (CMaR)

Opportunity Assistant


AI Analysis

AI Generate

Similar Active Opportunities