Background
The City of Garland is soliciting proposals for Post In-line Inspection Validations for the GP&L Ray Olinger Power Plant located in Nevada, Texas. This contract aims to provide an integrity assessment of Garland Power and Light’s (GP&L) 16-inch natural gas transmission line, which has undergone cleaning and in-line inspection activities that require validation. The project is essential for ensuring the safety and reliability of the gas transmission infrastructure.
Work Details
The contractor will perform three excavations with direct assessments in accordance with GP&L’s Integrity Management Plan (IMP) for In-Line Inspection (ILI) tool validation. The work includes:
1. Performing failure pressure calculations based on ILI results to establish safe excavation pressures.
2. Locating and exposing the pipeline and surrounding utilities using hand digging or soft dig methods.
3. Excavating at each predetermined anomaly until adequate pipeline exposure is achieved.
4. Conducting a pre-media blast inspection of the pipeline and coating to determine feasibility for media blasting.
5. Performing A-scan ultrasonic thickness measurements and manual pit depth measurements at anomaly locations.
6. Analyzing discovered conditions, remaining life calculations, and process evaluations.
7. Media blasting and preparing pipe for coating application.
8. Backfilling exposed piping once coating has cured and testing ensures no holidays are present.
9. Restoring the site to its original condition.
10. Providing a bell hole inspection report detailing findings, GPS coordinates, repair recommendations, A-Scan data, calculated anomaly operating pressures (CAOP), and photographs.
Period of Performance
The contract will commence upon approval from the Garland City Council and issuance of a purchase order by the City of Garland. The contractor must have approved insurance documents on file before starting any work.
Place of Performance
The work will be performed at the GP&L Ray Olinger Power Plant located at 13835 County Road 489, Nevada, TX 75173.
Bidder Requirements
Bidders must provide proof of Operator Qualification (OQ) for field personnel; otherwise, bids will be deemed non-responsive. All contractors and subcontractors must submit OQ documentation prior to any onsite work authorization. Additionally, bidders are required to submit a Bidders Qualification Statement including a list of all intended subcontractors.
The City of Garland is soliciting proposals for Post In-line Inspection Validations for the GP&L Ray Olinger Power Plant located in Nevada, Texas. This contract aims to provide an integrity assessment of Garland Power and Light’s (GP&L) 16-inch natural gas transmission line, which has undergone cleaning and in-line inspection activities that require validation. The project is essential for ensuring the safety and reliability of the gas transmission infrastructure.
Work Details
The contractor will perform three excavations with direct assessments in accordance with GP&L’s Integrity Management Plan (IMP) for In-Line Inspection (ILI) tool validation. The work includes:
1. Performing failure pressure calculations based on ILI results to establish safe excavation pressures.
2. Locating and exposing the pipeline and surrounding utilities using hand digging or soft dig methods.
3. Excavating at each predetermined anomaly until adequate pipeline exposure is achieved.
4. Conducting a pre-media blast inspection of the pipeline and coating to determine feasibility for media blasting.
5. Performing A-scan ultrasonic thickness measurements and manual pit depth measurements at anomaly locations.
6. Analyzing discovered conditions, remaining life calculations, and process evaluations.
7. Media blasting and preparing pipe for coating application.
8. Backfilling exposed piping once coating has cured and testing ensures no holidays are present.
9. Restoring the site to its original condition.
10. Providing a bell hole inspection report detailing findings, GPS coordinates, repair recommendations, A-Scan data, calculated anomaly operating pressures (CAOP), and photographs.
Period of Performance
The contract will commence upon approval from the Garland City Council and issuance of a purchase order by the City of Garland. The contractor must have approved insurance documents on file before starting any work.
Place of Performance
The work will be performed at the GP&L Ray Olinger Power Plant located at 13835 County Road 489, Nevada, TX 75173.
Bidder Requirements
Bidders must provide proof of Operator Qualification (OQ) for field personnel; otherwise, bids will be deemed non-responsive. All contractors and subcontractors must submit OQ documentation prior to any onsite work authorization. Additionally, bidders are required to submit a Bidders Qualification Statement including a list of all intended subcontractors.
Loading Map
Loading Map
Overview
Agency
Opportunity Type
Request for Proposal
Opportunity ID
REQ00002333
Version
1
Response Deadline
June 30, 2026
Due in 11 Days
Date Posted
June 3, 2026
Source
Q&A Deadline
All questions must be submitted within the Ion Wave Question & Answer segment. No emailed, faxed, or phone call questions related to this bid will be responded to. Contact: Liz Segura, esegura@garlandtx.gov.
Est. Value Range
Experimental
$150,000 - $600,000
(AI estimate)
Agency Distribution
Moderate
On 6/3/26 TX in Texas issued Request for Proposal Post In-Line Inspection Validation - Ray Olinger Power Plant with ID REQ00002333 due 6/30/26.
Contacts
Documents
Posted documents for Post In-Line Inspection Validation - Ray Olinger Power Plant
Opportunity Assistant
AI Analysis
AI Generate