Port SA B356 Cooling Tower Repairs
ID: CO-00881-TG • State: Texas
Opportunity Assistant
Loading
Description
Background
The San Antonio Water System (SAWS) is seeking sealed bids for the Port SA Building 356 Cooling Tower Repairs Project, designated as SAWS Job No. 24-7513. The project aims to address necessary repairs to the cooling towers at the Port SA Building 356 Chilled Water Plant, which is critical for maintaining operational efficiency in chilled water production.
Work Details
The scope of work includes repairs to three existing cooling towers located at the Port SA Building 356. Specific tasks include:
1. Concrete repairs for cracks and spalling in structural elements of the cooling towers.
2. Replacement of cooling tower fill, distribution piping, and drift eliminators.
3. Structural steel repairs as needed based on inspection findings.
4. Compliance with all applicable building codes and standards, including ASTM specifications for materials used in repairs.
5. Coordination with ongoing electrical equipment replacement projects to minimize downtime during repairs.
Period of Performance
The estimated duration for completing the project is 270 calendar days from the Notice to Proceed, expected around December 15, 2025.
Place of Performance
The work will be performed at the San Antonio Water System’s Building 356 Chilled Water Plant located at 3530 General Hudnell Dr., San Antonio, TX 78226.
Bidder Requirements
Bidders must comply with specific requirements including:
1. A Good Faith Effort Plan (GFEP) demonstrating outreach to small and minority-owned businesses (SBEs).
2. Submission of a bid bond or cashier's check amounting to at least five percent of the total bid price.
3. Proof of insurance coverage as specified in Section 5.7 of the General Conditions.
4. Contractors must perform at least 40% of the work with their own organization as indicated in their GFEP.
The San Antonio Water System (SAWS) is seeking sealed bids for the Port SA Building 356 Cooling Tower Repairs Project, designated as SAWS Job No. 24-7513. The project aims to address necessary repairs to the cooling towers at the Port SA Building 356 Chilled Water Plant, which is critical for maintaining operational efficiency in chilled water production.
Work Details
The scope of work includes repairs to three existing cooling towers located at the Port SA Building 356. Specific tasks include:
1. Concrete repairs for cracks and spalling in structural elements of the cooling towers.
2. Replacement of cooling tower fill, distribution piping, and drift eliminators.
3. Structural steel repairs as needed based on inspection findings.
4. Compliance with all applicable building codes and standards, including ASTM specifications for materials used in repairs.
5. Coordination with ongoing electrical equipment replacement projects to minimize downtime during repairs.
Period of Performance
The estimated duration for completing the project is 270 calendar days from the Notice to Proceed, expected around December 15, 2025.
Place of Performance
The work will be performed at the San Antonio Water System’s Building 356 Chilled Water Plant located at 3530 General Hudnell Dr., San Antonio, TX 78226.
Bidder Requirements
Bidders must comply with specific requirements including:
1. A Good Faith Effort Plan (GFEP) demonstrating outreach to small and minority-owned businesses (SBEs).
2. Submission of a bid bond or cashier's check amounting to at least five percent of the total bid price.
3. Proof of insurance coverage as specified in Section 5.7 of the General Conditions.
4. Contractors must perform at least 40% of the work with their own organization as indicated in their GFEP.
Overview
Opportunity ID
CO-00881-TG
Version
1
Response Deadline
Oct. 29, 2025
Past Due
Date Posted
Sept. 17, 2025
Est. Value Range
Experimental
$500,000 - $1,500,000
(AI estimate)
Agency Distribution
High
Source
On 9/17/25 San Antonio Water System in Texas issued Port SA Building 356 Cooling Tower Repairs with ID CO-00881-TG due 10/28/25.