Lake Water Treatment Plant Zebra Mussel Mitigation
ID: 202622 • State: Texas
Opportunity Assistant
Loading
Description
Background
The City of Georgetown is initiating a construction project for the Lake Water Treatment Plant Zebra Mussel Mitigation, aimed at addressing zebra mussel infestations in the water supply. The project involves the installation of a new copper ion system facility, which is critical for maintaining water quality and supporting the city's mission to provide safe drinking water.
Work Details
The project entails furnishing, installing, and providing all labor and materials necessary for constructing a new copper ion system facility at the Lake Water Treatment Plant. This includes:
- A copper ion unit
- Associated piping and valves
- Structural improvements
- Architectural enhancements
- HVAC systems
- Plumbing work
- Civil engineering tasks
- Electrical installations
- Instrumentation improvements. Detailed specifications are provided in the accompanying Drawings and Specifications.
Period of Performance
The contract performance period is expected to commence upon award and continue until the completion of the project, with bids due by May 12, 2026.
Place of Performance
The work will be performed at the Lake Water Treatment Plant located at 3601 D B Wood Rd, Georgetown, TX 78633.
Bidder Requirements
Bidders must register on the City of Georgetown's bid website. They are required to submit a Bid Security in the form of a sealed Bid Bond, Certified Check, or Cashier’s Check. Bidders must also comply with any local regulations regarding insurance and bonding as specified in the solicitation documents.
The City of Georgetown is initiating a construction project for the Lake Water Treatment Plant Zebra Mussel Mitigation, aimed at addressing zebra mussel infestations in the water supply. The project involves the installation of a new copper ion system facility, which is critical for maintaining water quality and supporting the city's mission to provide safe drinking water.
Work Details
The project entails furnishing, installing, and providing all labor and materials necessary for constructing a new copper ion system facility at the Lake Water Treatment Plant. This includes:
- A copper ion unit
- Associated piping and valves
- Structural improvements
- Architectural enhancements
- HVAC systems
- Plumbing work
- Civil engineering tasks
- Electrical installations
- Instrumentation improvements. Detailed specifications are provided in the accompanying Drawings and Specifications.
Period of Performance
The contract performance period is expected to commence upon award and continue until the completion of the project, with bids due by May 12, 2026.
Place of Performance
The work will be performed at the Lake Water Treatment Plant located at 3601 D B Wood Rd, Georgetown, TX 78633.
Bidder Requirements
Bidders must register on the City of Georgetown's bid website. They are required to submit a Bid Security in the form of a sealed Bid Bond, Certified Check, or Cashier’s Check. Bidders must also comply with any local regulations regarding insurance and bonding as specified in the solicitation documents.
Loading Map
Loading Map
Overview
Agency
Opportunity Type
Invitation to Bid
Opportunity ID
202622
Response Deadline
May 12, 2026
Due in 32 Days
Date Posted
April 6, 2026
Est. Value Range
Experimental
$500,000 - $2,000,000
(AI estimate)
Agency Distribution
Moderate
Source
On 4/6/26 Georgetown Texas in Texas issued Invitation to Bid Lake Water Treatment Plant Zebra Mussel Mitigation with ID 202622 due 5/11/26.