HVAC Mechanical Replacements Project, Central Campus

ID: IFB25-07B • State: Texas
Real Time Relevant State, Local, and Education Bids from all 50 States
Find Now

Description

The Houston Community College, ( HCC and/orthe College ) is seeking competitive sealed bids from qualified contractors forHVAC Mechanical Replacements Project, Central Campus, in accordance with theplans and specifications referenced herein. Qualified firms are invited to submit a written response outlining theirbid to provide goods, equipment, and services as described in the Scope ofWork, and in accordance with the terms, conditions and requirements set forthin the Invitation for Bid (IFB). The successfulbidder will provide the scope of work in accordance with allapplicable laws, regulations, and professional standards.


Background
The Houston Community College (HCC) is seeking competitive sealed bids from qualified contractors for the HVAC Mechanical Replacements Project at its Central Campus. This project aims to enhance the college's facilities by replacing outdated HVAC systems, thereby improving operational efficiency and comfort for students and staff.

HCC serves a diverse community, offering various educational programs and services across its nineteen campuses, which collectively span over 6.5 million square feet and serve approximately 85,858 students.

Work Details
The project involves the mechanical replacement of seventeen (17) air handler units (AHUs), associated equipment, and building automation system (BAS) controls. The BAS will be updated to the current Ecostruxure system. The work will cover an area of 71,600 square feet and includes:

- General Conditions
- Demolition of site and building as per drawings
- Thermal and Moisture Protection/Rigid Insulation as per drawings
- Roofing as per drawings
- Fireproofing as per drawings
- Fire Sprinkler installation as per drawings
- Plumbing as per drawings
- Mechanical/HVAC installation as per drawings
- Electrical work as per specifications
- Fire Alarm installation as per drawings
- Building Automation System installation as per specifications
- Final cleaning after project completion.

Additionally, the contractor must remove and properly dispose of existing HVAC equipment in compliance with all relevant laws and regulations.

Period of Performance
The contract duration will commence upon Notice to Proceed, with substantial completion expected within a specified number of calendar days that will be determined based on the contractor's bid.

Place of Performance
The contract work will be performed at Houston Community College's Central Campus located at 1215 Holman St., Houston, TX 77004.

Overview

Opportunity ID
IFB25-07B
Response Deadline
Dec. 3, 2024 Past Due
Date Posted
Oct. 25, 2024
Est. Value Range
Experimental
$500,000 - $2,000,000 (AI estimate)
Agency Distribution
High
Source
On 10/25/24 Houston Community College System in Texas issued HVAC Mechanical Replacements Project, Central Campus with ID IFB25-07B due 12/2/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for HVAC Mechanical Replacements Project, Central Campus

Additional Details

Class Codes
91450-Heating, Ventilating And Air Conditioning (Hvac); 90922-Building Construction, Non-Residential (Office Bldg., Etc.); 90924-Building Construction, Commercial And Institutional; 90927-Building Construction, Educational;