Design/Build Team for University Center Renovation and New Addition
ID: FM2024-014
• State: Texas
Opportunity Assistant
Loading
Description
Background
The University of Texas at Arlington is issuing a Request for Qualifications for a Design/Build team for University Center Renovation and New Addition project. The project is governed by the Texas Government Code, Sections 2161.181-182 and Title 34, Rule 20.281 of the Texas Administrative Code (TAC), which requires a good faith effort to utilize Historically Underutilized Businesses (HUBs) in contracts for construction services, including professional and consulting services; and commodities contracts.
Work Details
The Design/Build team is required to submit a Historically Underutilized Subcontracting Plan (HSP) for pre-construction services and professional services. The HSP must include a determination of good faith effort, notification to subcontractors, and encouragement for non-certified minority or woman-owned business subcontractors to apply for HUB certification.
The HSP should also include bid package notification and notification to awarded subcontractors.
The Design Build alternate delivery method is a two-step process involving pre-construction services and building construction.
Period of Performance
The period of performance details are not explicitly mentioned in the provided text.
Place of Performance
The project will be performed at the University Center Student Government Chambers (2nd Floor), 300 W. First Street, Arlington, TX 76010.
The University of Texas at Arlington is issuing a Request for Qualifications for a Design/Build team for University Center Renovation and New Addition project. The project is governed by the Texas Government Code, Sections 2161.181-182 and Title 34, Rule 20.281 of the Texas Administrative Code (TAC), which requires a good faith effort to utilize Historically Underutilized Businesses (HUBs) in contracts for construction services, including professional and consulting services; and commodities contracts.
Work Details
The Design/Build team is required to submit a Historically Underutilized Subcontracting Plan (HSP) for pre-construction services and professional services. The HSP must include a determination of good faith effort, notification to subcontractors, and encouragement for non-certified minority or woman-owned business subcontractors to apply for HUB certification.
The HSP should also include bid package notification and notification to awarded subcontractors.
The Design Build alternate delivery method is a two-step process involving pre-construction services and building construction.
Period of Performance
The period of performance details are not explicitly mentioned in the provided text.
Place of Performance
The project will be performed at the University Center Student Government Chambers (2nd Floor), 300 W. First Street, Arlington, TX 76010.
Overview
Opportunity ID
FM2024-014
Response Deadline
July 31, 2024
Past Due
Date Posted
July 8, 2024
Source
Est. Value Range
Experimental
$5,000,000 - $20,000,000
(AI estimate)
Agency Distribution
High
On 7/8/24 Univ Of Texas At Arlington in Texas issued Design/Build Team for University Center Renovation and New Addition with ID FM2024-014 due 7/30/24.
Contacts
Documents
Posted documents for Design/Build Team for University Center Renovation and New Addition
Opportunity Assistant
AI Analysis
AI Generate
Additional Details
Class Codes
90610-Buildings - Architectural Design;
90638-General Construction - Architectural;
90924-Building Construction, Commercial And Institutional;