Culebra Road (IH-10 to Callaghan Road (2022 Bond)
ID: 23-03874
• State: Texas
Opportunity Assistant
Loading
Description
Background
The City of San Antonio, through its Capital Delivery Department, is issuing a formal invitation for bids (IFB) for the Culebra Road project, which extends from IH-10 to Callaghan Road.
This project is part of the 2022 Bond initiative aimed at improving infrastructure within the city.
The estimated construction budget for this contract is $14,739,459.68, which includes allocations for various utilities and construction costs.
Work Details
The contract involves a unit price construction project that may include various tasks as determined by the City of San Antonio.
The estimated budget breakdown is as follows:
- CoSA: $12,429,281.83
- SAWS: $1,807,000.00
- CPS Energy: $503,177.85
- Alternates: $3,358,932.69.
Bidders must provide prices for all units or line items including any alternates specified in the bid documents.
The work must be substantially completed within 400 calendar days.
Period of Performance
The contract work is expected to be substantially completed on or before 400 calendar days from the start date.
Place of Performance
The work will be performed on Culebra Road between IH-10 and Callaghan Road in San Antonio, Texas.
Bidder Requirements
Bidders must comply with the Small Business Economic Development Advocacy (SBEDA) Program requirements and submit a Subcontractor/Supplier Utilization Plan as part of their proposal.
Registration with the San Antonio E-Procurement System (SAePS) is required to determine SBEDA eligibility.
Additionally, bidders must adhere to local preference program ordinances and meet prevailing wage rate requirements as established for this contract.
The City of San Antonio, through its Capital Delivery Department, is issuing a formal invitation for bids (IFB) for the Culebra Road project, which extends from IH-10 to Callaghan Road.
This project is part of the 2022 Bond initiative aimed at improving infrastructure within the city.
The estimated construction budget for this contract is $14,739,459.68, which includes allocations for various utilities and construction costs.
Work Details
The contract involves a unit price construction project that may include various tasks as determined by the City of San Antonio.
The estimated budget breakdown is as follows:
- CoSA: $12,429,281.83
- SAWS: $1,807,000.00
- CPS Energy: $503,177.85
- Alternates: $3,358,932.69.
Bidders must provide prices for all units or line items including any alternates specified in the bid documents.
The work must be substantially completed within 400 calendar days.
Period of Performance
The contract work is expected to be substantially completed on or before 400 calendar days from the start date.
Place of Performance
The work will be performed on Culebra Road between IH-10 and Callaghan Road in San Antonio, Texas.
Bidder Requirements
Bidders must comply with the Small Business Economic Development Advocacy (SBEDA) Program requirements and submit a Subcontractor/Supplier Utilization Plan as part of their proposal.
Registration with the San Antonio E-Procurement System (SAePS) is required to determine SBEDA eligibility.
Additionally, bidders must adhere to local preference program ordinances and meet prevailing wage rate requirements as established for this contract.
Loading Map
Loading Map
Overview
Agency
Opportunity ID
23-03874
Response Deadline
Feb. 13, 2026
Past Due
Date Posted
Jan. 12, 2026
Source
Pre-Bid Conference
A non-mandatory Pre-bid meeting will be held through Webex.
Est. Value Range
Experimental
$5,000,000 - $15,000,000
(AI estimate)
Agency Distribution
High
On 1/12/26 City of San Antonio in Texas issued Culebra Road (IH-10 to Callaghan Road (2022 Bond) with ID 23-03874 due 2/12/26.
Contacts
Documents
Posted documents for Culebra Road (IH-10 to Callaghan Road (2022 Bond)
Opportunity Assistant
AI Analysis
AI Generate
Classifications
Additional Details
Class Codes
91350-Construction, Street (Major And Residential)(Includes Reconstruction);
91345-Construction, Sewer And Storm Drain;
91479-Structural and Reinforcement Metal Work (Inactive, please see commodity code 914;
91276-Striping Streets, Parking Facilities, Lane Divisions, Etc. (Paint);
98852-Landscaping (Including Design, Fertilizing, Planting, Etc., But Not Grounds Maintenance Or Tree Trimming Services);
91360-Construction, Water System/Plants, Main And Service Line;
91340-Construction, Pipeline, Including Aerial Crossings;