CSP - Grease Waste Infrastructure Replacement at Ben Taub Hospital for Harris Health (Estimated Budget - $948, 500)
ID: 26/0107 • State: Texas
Opportunity Assistant
Loading
Description
Background
The contract is issued by Harris Health for the Grease Waste Infrastructure Replacement at Ben Taub Hospital. The project aims to replace the existing grease waste and vent systems to ensure compliance with health and safety standards, thereby supporting the hospital's mission of providing quality healthcare services.
Work Details
The scope of work includes:
1. **Excavation and Backfill**: This involves trench excavation for plumbing piping systems both inside and outside the building, including necessary clearing, tree removal, and disposal of excess excavation material. Specific fill materials are detailed, including Type 1 Fill (no stones larger than 3 inches) and Type 2A Fill (sand or gravel with none larger than 2 inches).
2. **Grease Waste and Vent System**: Installation of new grease waste piping within the building and connecting to an external grease interceptor. Materials must comply with specified standards, including PVC pipes and fittings.
3. **Trenching, Backfilling, and Compaction**: Requirements for excavating trenches for storm sewer, sanitary sewer, and water distribution lines while ensuring proper compaction and backfill materials are used.
4. **Erosion and Sedimentation Control**: Implementation of measures to control erosion during construction activities, including installation of silt fences, straw bale barriers, and other best management practices.
Period of Performance
The contract is expected to be completed by December 3, 2025.
Place of Performance
All work will be performed at Ben Taub Hospital located in Houston, Texas.
Bidder Requirements
Contractors must comply with local regulations regarding erosion control as per the National Pollution Discharge Elimination System Phase II regulations. Additionally, contractors are responsible for obtaining all necessary construction permits prior to commencement of work.
The contract is issued by Harris Health for the Grease Waste Infrastructure Replacement at Ben Taub Hospital. The project aims to replace the existing grease waste and vent systems to ensure compliance with health and safety standards, thereby supporting the hospital's mission of providing quality healthcare services.
Work Details
The scope of work includes:
1. **Excavation and Backfill**: This involves trench excavation for plumbing piping systems both inside and outside the building, including necessary clearing, tree removal, and disposal of excess excavation material. Specific fill materials are detailed, including Type 1 Fill (no stones larger than 3 inches) and Type 2A Fill (sand or gravel with none larger than 2 inches).
2. **Grease Waste and Vent System**: Installation of new grease waste piping within the building and connecting to an external grease interceptor. Materials must comply with specified standards, including PVC pipes and fittings.
3. **Trenching, Backfilling, and Compaction**: Requirements for excavating trenches for storm sewer, sanitary sewer, and water distribution lines while ensuring proper compaction and backfill materials are used.
4. **Erosion and Sedimentation Control**: Implementation of measures to control erosion during construction activities, including installation of silt fences, straw bale barriers, and other best management practices.
Period of Performance
The contract is expected to be completed by December 3, 2025.
Place of Performance
All work will be performed at Ben Taub Hospital located in Houston, Texas.
Bidder Requirements
Contractors must comply with local regulations regarding erosion control as per the National Pollution Discharge Elimination System Phase II regulations. Additionally, contractors are responsible for obtaining all necessary construction permits prior to commencement of work.
Loading Map
Loading Map
Overview
Agency
Opportunity Type
CSP
Opportunity ID
26/0107
Response Deadline
May 11, 2026
Due in 24 Days
Date Posted
April 3, 2026
Est. Value Range
Experimental
$900,000 - $1,000,000
(AI estimate)
Agency Distribution
High
Source
On 4/3/26 Harris County in Texas issued CSP Grease Waste Infrastructure Replacement at Ben Taub Hospital for Harris Health with ID 26/0107 due 5/11/26.