Core Switch Refresh Project
ID: TS-Core-01FY29
• State: Texas
Opportunity Assistant
Loading
Description
Background
Aldine Independent School District (Aldine ISD) is seeking proposals for the Core Switch Refresh Project to enhance its network infrastructure. The goal of this project is to upgrade the core switching equipment to improve connectivity and support the district's educational mission. The RFP process will allow for vendor evaluation and selection through sealed proposals submitted via the Aldine ISD eBid System.
Work Details
The contract involves the procurement and installation of new core switches, including necessary hardware and software components. Specific requirements include:
- Replacement of existing core switches with updated models that meet or exceed current performance standards.
- Provision of all necessary cabling, connectors, and accessories required for installation.
- Configuration services to ensure proper integration with existing network infrastructure.
- Documentation and training for district staff on the new systems.
- Compliance with all applicable local, state, and federal regulations regarding technology procurement.
Period of Performance
The contract will commence upon award and is expected to be completed by January 22, 2026.
Place of Performance
The work will be performed at various locations within Aldine Independent School District, primarily at the district's central office located at 2520 W.W. Thorne Blvd., Houston, TX 77073.
Bidder Requirements
Vendors must register in the Aldine ISD e-Bid system to submit a proposal. There are no specific set-aside certifications mentioned; however, vendors are encouraged to demonstrate their capability to meet the project requirements effectively.
Aldine Independent School District (Aldine ISD) is seeking proposals for the Core Switch Refresh Project to enhance its network infrastructure. The goal of this project is to upgrade the core switching equipment to improve connectivity and support the district's educational mission. The RFP process will allow for vendor evaluation and selection through sealed proposals submitted via the Aldine ISD eBid System.
Work Details
The contract involves the procurement and installation of new core switches, including necessary hardware and software components. Specific requirements include:
- Replacement of existing core switches with updated models that meet or exceed current performance standards.
- Provision of all necessary cabling, connectors, and accessories required for installation.
- Configuration services to ensure proper integration with existing network infrastructure.
- Documentation and training for district staff on the new systems.
- Compliance with all applicable local, state, and federal regulations regarding technology procurement.
Period of Performance
The contract will commence upon award and is expected to be completed by January 22, 2026.
Place of Performance
The work will be performed at various locations within Aldine Independent School District, primarily at the district's central office located at 2520 W.W. Thorne Blvd., Houston, TX 77073.
Bidder Requirements
Vendors must register in the Aldine ISD e-Bid system to submit a proposal. There are no specific set-aside certifications mentioned; however, vendors are encouraged to demonstrate their capability to meet the project requirements effectively.
Loading Map
Loading Map
Overview
Opportunity Type
RFP
Opportunity ID
TS-Core-01FY29
Response Deadline
Jan. 22, 2026
Past Due
Date Posted
Dec. 18, 2025
Source
Est. Value Range
Experimental
$500,000 - $2,000,000
(AI estimate)
Agency Distribution
High
On 12/18/25 Aldine Independent School District in Texas issued RFP Core Switch Refresh Project with ID TS-Core-01FY29 due 1/22/26.
Contacts
Documents
Posted documents for Core Switch Refresh Project
Opportunity Assistant
AI Analysis
AI Generate