Class/Item
Description
155-70
Portable Toilets
330-55
Fencing, Temporary (For Construction and Other Industrial or Safety Uses)
450-72
Scaffolding, Sectional (Including Work Platforms)
909-76
Site Work (Incl. Site Clean-Up)
910-14
Door Installation, Maintenance, and Repair (Metal)
910-86
Siding Installation and Repair Services
912-23
Construction, General (Backfill Services, Digging, Ditching, Road Grading, etc.)
912-44
Excavation Services
914-27
Carpentry
914-30
Concrete
914-38
Electrical
914-5
Metal Work
914-73
Roofing and Siding
914-79
Structural Steel
914-85
Welding
962-39
Hauling Services
971-08
Building, Fabricated, Pre-Fabricated or Pre-manufactured, Rental or Lease
977-63
Scaffolding and Ladders Rental or Lease
SCOPE: Inaccordance with the provisions of Texas Government Code, Chapter 2269 SubchapterD, Competitive Sealed Proposal Method, and Rules and Procedures adopted by theTexas Facilities Commission (TFC), TFC is soliciting proposals for primeconstruction services for Project 22-013-2513, Department of Public SafetyCrime Lab Training Facilities, located at 5805 North Lamar Blvd., Austin, Texas
CONTRACT TERM: Constructionis required to commence within fourteen (14) calendar days after the Notice toProceed is issued. The contract period is projected for a term of seven hundredthirty (730) calendar days except as may be otherwise amended or negotiated.
STATEMENT OF WORK: Provideall materials, equipment, labor, coordination and supervisory activitiesnecessary to complete construction of the project as more fully described inthe Attachment D Project Manual, and Attachment E ProjectDrawings, which include specifications, drawings, and other contractdocuments, prepared by the A/E of record, Parkhill, and TFC.
MANDATORY PRE-SUBMITTALTELECONFERENCES: Themandatory pre-submittal conferences will be held on Tuesday, April 15, 2025 at10:00 AM and Wednesday, April 16, 2025 at 10:00 AM. Pre-registration is required to participate inthe teleconference. Respondents must have an employee of their firm attendat least one (1) of the two (2) scheduled pre-submittal teleconferences.TFC shall reject submittals submitted by firms that did not attend one of themandatory pre-submittal conferences.
TFC is using the eProcurementsystem Bonfire. Respondents mustregister for a Bonfire account (No Charge) to submit a response. Respondents must submit theirresponses/submittals at the following link: https://tfcstate.bonfirehub.com/opportunities/176440
Issue RFQ
3/31/2025
Mandatory Pre-Submittal Teleconferences
1st PSC
2nd PSC
4/15/2025, 10:00 AM
4/16/2025, 10:00 AM
Deadline for Submission of Questions
4/22/2025
Deadline for Submission of Qualifications
4/29/2025, 3:00 PM
Deadline for Submission of HSP
4/30/2025, 3:00 PM
Notification of Short List Selection
5/09/2025
Site Visit
5/15/2025, 9:00 AM
Deadline for Submission of Proposals
5/22/2025, 3:00 PM
Notification of Interview Selection
6/06/2025
Interviews
6/17/2025
Award by Commission
7/17/2025, 9:00 AM
Execute Contract
9/01/2025
This Request for Qualifications (RFQ)is posted on the Electronic State Business Daily (ESBD) located on the TexasComptroller of Public Accounts' web page located at
https://www.txsmartbuy.com/esbddetails/view/0004688
This website will have the most currentinformation during the solicitation.
NOTE:All vendors interested in getting access to the drawings for this solicitationmust fill out Attachment H - Confidentiality and Non-Disclosure Agreementand submit to the Purchaser at james.gonzalez@tfc.texas.gov.
Background
The Texas Facilities Commission (TFC) is issuing this solicitation for prime construction services for the Department of Public Safety Crime Lab Training Facility, located at 5805 North Lamar Blvd., Austin, Texas.
The project aims to enhance the capabilities of the Crime Lab through the construction of a dedicated training facility, aligning with TFC's mission to provide efficient and effective facilities management.
Work Details
The contractor will be responsible for providing all materials, equipment, labor, coordination, and supervisory activities necessary to complete the construction of the project. Specific items include:
- Portable Toilets
- Temporary Fencing for Construction and Other Industrial or Safety Uses
- Scaffolding (Including Work Platforms)
- Site Work (Including Site Clean-Up)
- Door Installation (Metal)
- Siding Installation and Repair Services
- General Construction (Backfill Services, Digging, Ditching, Road Grading)
- Excavation Services
- Carpentry
- Concrete work
- Electrical work
- Metal Work
- Roofing and Siding installation
- Structural Steel installation
- Welding services
- Hauling Services.
The contractor must adhere to specifications outlined in Attachment D – Project Manual and Attachment E – Project Drawings prepared by Parkhill.
Period of Performance
Construction is required to commence within fourteen (14) calendar days after the Notice to Proceed is issued. The contract period is projected for a term of seven hundred thirty (730) calendar days.
Place of Performance
5805 North Lamar Blvd., Austin, Texas.